BLD-Final | 7/2/2001 | 7/2/2001 | 7/2/2001 | P | PASS |
Jim Sly
|
|
|
chuck ###-#### C/C issued 7/2/2001 6:12:15 PM
|
FIRE-Final Inspection | 7/2/2001 | 7/2/2001 | 7/2/2001 | A | CANC |
Joe Tawney
|
|
|
Cancel Should be structural Insp 7/2/2001 8:12:54 AM
|
BLD-Energy code compliance | 5/10/2001 | 5/11/2001 | 5/11/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/10/2001 | 5/11/2001 | 5/11/2001 | A | PASS |
Jim Sly
|
|
|
Chuck ###-####
|
BLD-Framing/Rough-in | 5/9/2001 | 5/9/2001 | 5/9/2001 | P | PART |
Jim Sly
|
|
|
shear wall Chuck ###-#### Shear OK. 5/9/2001 12:45:56 PM
|
BLD-Foundation | 4/18/2001 | 4/19/2001 | 4/19/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/18/2001 at 18:20:07. Contact: ###-####.
|
BLD-Footing | 4/18/2001 | 4/18/2001 | 4/18/2001 | P | PART |
Dave Hannah
|
|
|
###-#### W.I.P. 4/18/2001 3:28:43 PM
|