BLD-Final | 6/6/2001 | 6/7/2001 | 6/7/2001 | A | PASS |
Russ Owen
|
|
|
Chuck ###-#### lc issued,. 1/7/2002 10:25:18 AM
|
BLD-Energy code compliance | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/4/2001 | 5/4/2001 | 5/4/2001 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/2/2001 | 5/2/2001 | 5/2/2001 | P | PART |
Jim Sly
|
|
|
shear wall reinspection ###-#### Shear OK. 5/2/2001 4:08:36 PM
|
BLD-Framing/Rough-in | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | FAIL |
Jim Sly
|
|
|
shear chuck ###-####
|
BLD-Foundation | 4/18/2001 | 4/19/2001 | 4/19/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/18/2001 at 18:22:56. Contact: ###-####.
|
BLD-Footing | 4/18/2001 | 4/18/2001 | 4/18/2001 | P | PART |
Dave Hannah
|
|
|
W.I.P. 4/18/2001 3:28:21 PM
|