BLD-Final | 7/12/2001 | 7/13/2001 | 7/13/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/12/2001 at 09:07:49. Contact: ###-####. OK for Perm Occ. 7/13/2001 8:34:00 AM
|
Permanent Occupancy | | 7/13/2001 | 7/13/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/11/2001 | 7/12/2001 | 7/12/2001 | P | PASS |
Joe Tawney
|
|
|
Final OK for permanant occupancy 7/12/2001 4:35:27 PM
|
BLD-Conference | 6/14/2001 | 6/15/2001 | 6/15/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/14/2001 at 15:06:40. Contact: ###-####.
|
FIRE-Conference | 6/14/2001 | 6/15/2001 | 6/15/2001 | A | PASS |
Joe Tawney
|
|
|
Conf with contr regarding Exit signs 6/15/2001 9:36:51 AM
|
FIRE-Final Inspection | 6/13/2001 | 6/14/2001 | 6/14/2001 | P | PART |
Joe Tawney
|
|
|
eric ###-#### OK on spklr system 6/14/2001 1:51:15 PM
|
BLD-Other | 6/11/2001 | 6/12/2001 | 6/12/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 10:56:51. Contact: ###-####. Ceiling grid 6/12/2001 4:59:24 PM
|
FIRE-Sprinkler Rough-in | 5/23/2001 | 5/24/2001 | 5/24/2001 | A | PART |
Joe Tawney
|
|
|
Sam ###-#### OK to cover hard lid area at front entrance 5/24/2001 10:29:47 AM
|
BLD-Framing/Rough-in | 5/15/2001 | 5/15/2001 | 5/15/2001 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Conference | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 08:24:39. Contact: ###-####. canc by contr. 5/8/2001 4:09:44 PM
|
BLD-Conference | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 5/8/2001 4:21:30 PM conf with contr regarding alarm system for tenant space. Rest of bldg has full system. Adv to contact owner for their intension.
|