BLD-Final | 6/15/2005 | 6/16/2005 | 6/16/2005 | P | PASS |
Tony Young
|
|
|
PLease call at least 30 mins prior to inspection so he can meet ya there///eric; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
DOC - Permit Finaled | 6/16/2005 | 6/16/2005 | 6/16/2005 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/7/2005 | 6/7/2005 | 6/7/2005 | P | FAIL |
Tony Young
|
|
|
per tony young c/n,, no inspection made,, need trades 1st
|
BLD-Concrete | 9/22/2003 | 9/23/2003 | 9/23/2003 | P | CANC |
Russ Owen
|
|
|
eric please call first; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Energy code compliance | 9/3/2003 | 9/4/2003 | 9/4/2003 | A | PASS |
Dave Hannah
|
|
|
eric-- ###-#### re-insp--call 1st before insp
|
BLD-Energy code compliance | 8/18/2003 | 8/19/2003 | 8/19/2003 | A | FAIL |
Steven Webb
|
|
|
###-#### ERIC C/N--Need mechanical r.i, Need at least R-30 on ceiling. Do not cover. 8/19/2003 10:41:36 AM
|
BLD-Energy code compliance | 8/15/2003 | 8/18/2003 | 8/18/2003 | A | CANC |
Jim Storey
|
|
|
###-#### ERIC out of time. 8/18/2003 4:58:02 PM
|
BLD-Framing/Rough-in | 5/5/2003 | 5/6/2003 | 5/6/2003 | A | PART |
Dave Hannah
|
|
|
CALL 1ST BEFORE INSP ###-####-ERIC most of c/n items completed ok to start insulating 5/6/2003 11:05:07 AM
|
BLD-Conference | 3/19/2003 | 3/21/2003 | 3/21/2003 | P | PART |
Russ Owen
|
|
|
###-#### ERIC. Went over issues and left the owner a list on c/n. 3/21/2003 3:33:48 PM
|
BLD-Conference | 8/28/2002 | 8/29/2002 | 8/29/2002 | A | PASS |
Carl Dependahl
|
|
|
###-#### OR ###-#### ERIC...change steps to meet code...add headroom. 8/29/2002 6:09:59 PM
|
BLD-Conference | 1/29/2002 | 1/30/2002 | 2/5/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 1/29/2002 6:57:41 PM stairs...not on plan! for 2 story!!
|
BLD-Conference | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PASS |
Carl Dependahl
|
|
|
###-#### code req's & design service 1/29/2002 6:59:30 PM
|
BLD-Aging Inspection | 12/31/2001 | 12/31/2001 | 1/3/2002 | | NR |
Carl Dependahl
|
|
|
wip 1/3/2002 10:24:45 AM
|
BLD-Aging Inspection | 10/29/2001 | 10/29/2001 | 11/5/2001 | | NR |
Carl Dependahl
|
|
|
homeowner job...wip 11/5/2001 5:42:23 PM
|
BLD-Aging Inspection | 8/27/2001 | 8/27/2001 | 8/27/2001 | | NR |
Carl Dependahl
|
|
|
possible problem job, no call since correction... 8/27/2001 11:28:06 AM
|
BLD-Foundation | 6/25/2001 | 6/26/2001 | 6/26/2001 | A | PART |
Tony Young
|
|
|
please call before going Eric ###-####
verbal corrections 6/26/2001 11:31:26 AM
|
BLD-Conference | 6/1/2001 | 6/1/2001 | 6/1/2001 | A | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/1/2001 10:56:13 AM c/n...obtain plbg r/i for drainage below slab & foundation prior to concrete pour (walls) reinforce areas w/ pipes or provide eng'd alternate
|
BLD-Foundation | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | FAIL |
Carl Dependahl
|
|
|
Eric ###-####; c/n issued 6/1/2001 11:33:10 AM
|
BLD-Footing | 5/22/2001 | 5/23/2001 | 5/23/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/22/2001 at 14:35:41. Contact: ###-####. wip-done by 5/23/2001 3:05:57 PM 415 5/23/2001 3:06:12 PM
|