BLD-Final | 4/24/2002 | 4/25/2002 | 4/25/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/24/2002 at 13:09:07. Contact: ###-####. met w/ owner & rep, verified improper drainage being repaired, (eng'd receptacle being installed)backfill at bsmt. walls filled w/ trash, grade sloped toward bldg, Roof material missing near joint to existing bldg. No final approval of work at this time, owner is ok to occupy. The contractor has never called for final inspections...project was "tagged" with c/n off aging list as about to expire. 4/25/2002 1:59:02 PM
|
BLD-Final | 4/23/2002 | 4/23/2002 | 4/23/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 07:32:51. Contact: ###-####.
|
BLD-Final | 4/2/2002 | 4/3/2002 | 4/3/2002 | P | FAIL |
Carl Dependahl
|
|
|
###-#### BILL; c/n, need plans, verify prior corrections made...historic? See c/n. 4/3/2002 5:10:12 PM
|
BLD-Conference | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | PASS |
Carl Dependahl
|
|
|
###-#### BILL; will try to activate hvac for final...& address other issues for final; ok to keep permit open 4/2/2002 10:45:21 AM
|
BLD-Aging Inspection | 12/18/2001 | 12/18/2001 | 12/18/2001 | | NR |
Carl Dependahl
|
|
|
exp 4-02 12/19/2001 6:51:20 PM
|
BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 | | NR |
Carl Dependahl
|
|
|
left c/n to obtain finals 10/15/2001 11:56:21 AM
|
BLD-Aging Inspection | 8/13/2001 | 8/13/2001 | 8/13/2001 | | PASS |
Carl Dependahl
|
|
|
wip 8/13/2001 8:18:15 AM
|
BLD-Energy code compliance | 6/13/2001 | 6/13/2001 | 6/13/2001 | P | PASS |
Carl Dependahl
|
|
|
energy josh ###-####
|
BLD-Energy code compliance | 6/13/2001 | 6/13/2001 | 6/13/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/13/2001 11:41:17 AM ins ok...
|
BLD-Energy code compliance | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | PART |
Russ Owen
|
|
|
###-#### complete 1 st correction need venting at top of ceiling , wrote this again on c/n. 1/12/2002 3:20:38 PM
|
BLD-Energy code compliance | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | FAIL |
Carl Dependahl
|
|
|
Tim, ###-####; complete insul & c/n, 2nd c/n issued...complete elec, strap plbg 6/11/2001 12:15:40 PM 6/11/2001 12:16:19 PM
|
BLD-Framing/Rough-in | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | FAIL |
Carl Dependahl
|
|
|
Tim, ###-#### - reinspection complete c/n 6/11/2001 12:15:26 PM
|
BLD-Framing/Rough-in | 6/7/2001 | 6/8/2001 | 6/8/2001 | P | FAIL |
Carl Dependahl
|
|
|
fr insp- tim ###-#### c/n air seal, hvac r/i?? ok to insul pend hvac. 6/8/2001 4:21:51 PM
|
BLD-Foundation | 5/17/2001 | 5/18/2001 | 5/18/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 15:53:46. Contact: . walls ok to grout 5/18/2001 10:03:30 AM
|
BLD-Conference | 5/14/2001 | 5/14/2001 | 5/14/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/14/2001 9:39:37 AM w/ masons...ok to add 2 #4 at openings in lieu of #5... complete lay up for insp.
|
BLD-Foundation | 5/11/2001 | 5/14/2001 | 5/14/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/11/2001 at 15:54:12. Contact: ...1st lift...bar ok 5/14/2001 2:36:46 PM
|
BLD-Foundation | 5/11/2001 | 5/14/2001 | 5/11/2001 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/11/2001 at 08:37:03. Contact: . Disp set to [CANC] by a contractor via Hello! on 05/11/2001 at 15:52:53.
|
BLD-Foundation | 5/10/2001 | 5/11/2001 | 5/11/2001 | A | NR |
Tony Young
|
|
|
###-#### Tim
|
BLD-Footing | 5/4/2001 | 5/7/2001 | 5/7/2001 | A | PART |
Tony Young
|
|
|
he wants 9:00am if possible\\###-####
no plans, verbal corrections, pour at own risk 5/7/2001 10:34:49 AM
|