BLD-Final | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 10:09:46. Contact: ###-####. l/c on site 7/9/2001 2:17:01 PM
|
BLD-Energy code compliance | 5/22/2001 | 5/22/2001 | 5/22/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/22/2001 at 07:38:56. Contact: ###-####. c/n items have been completed all but for soild blocking bearinr wall in crawel space ok tocover 5/22/2001 2:43:38 PM
|
BLD-Framing/Rough-in | 5/22/2001 | 5/22/2001 | 5/22/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/22/2001 at 07:37:58. Contact: ###-####. 5/22/2001 12:46:03 PM c/n on site 5/22/2001 1:09:46 PM
|
BLD-Energy code compliance | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 08:48:13. Contact: ###-####. this house has not been insulsted yet. 12/21/2001 2:14:24 PM
|
BLD-Framing/Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 08:47:39. Contact: ###-####. c/n posted on inside window,need truss details and floor joist blocking. 12/21/2001 2:15:08 PM
|
BLD-Framing/Rough-in | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/18/2001 at 10:46:03. Contact: ###-####. need mech insp. 5/18/2001 2:52:29 PM
|
BLD-Framing/Rough-in | 5/10/2001 | 5/10/2001 | 5/10/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 10:52:58. Contact: ###-####. exterior walls ok for cover. 5/10/2001 2:11:18 PM
|
BLD-Foundation | 4/23/2001 | 4/24/2001 | 4/24/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/23/2001 at 15:03:50. Contact: ###-####.
|
BLD-Footing | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/23/2001 at 07:54:14. Contact: ###-####. south p/l ok 5ft 6 in 4/23/2001 2:15:28 PM
|
BLD-Foundation | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | PASS |
Jim Storey
|
|
|
matt ###-#### stem wall walls ok 4/16/2001 10:57:20 AM
|
BLD-Footing | 4/13/2001 | 4/13/2001 | 4/13/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/13/2001 at 10:36:34. Contact: ###-####.
no forms in place yet, t/w contractor, verbal corrections w/ soil, roots etc., will make ftg. larger w/ rebar and get all roots out 4/13/2001 2:04:03 PM
|