Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-00912
StatusFinaled
Name BOISE VALLEY HABITAT FOR HUMAN
Site Address 3659 N MAPLE GROVE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is to build a new 1458s.f. 5-bedroom 1-story single family dwelling. Setbacks approved by rhj. 20foot driveway is required from concrete required parking; to the street addressed from. All per the approved plans and attached conditions list. PC# 0327. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/15/200111/15/200111/15/2001PPASS
DetailsDave Hannah
###-#### DEAN c.c # 22025 issued 11/15/2001 1:19:42 PM
BLD-Conference11/13/200111/13/200111/13/2001PCANC
DetailsAlan Hauser
Scheduled by Inspector: 350 On 11/13/2001 3:03:58 PM
BLD-Aging Inspection9/17/20019/17/20019/17/2001 DONE
DetailsDave Hannah
work in progress 9/17/2001 10:01:28 AM
BLD-Energy code compliance7/16/20017/16/20017/16/2001PPASS
DetailsRuss Owen
Leroy Meyer ###-####
BLD-Framing/Rough-in7/12/20017/13/20017/13/2001APASS
DetailsDave Hannah
Leeroy ###-#### truss eng ok . ok to insulate 7/13/2001 9:59:13 AM
BLD-Framing/Rough-in7/12/20017/12/20017/12/2001PPASS
DetailsDave Hannah
Added by Inspector: 425 On 7/12/2001 3:47:46 PM framing ok but need truss engineering ok to insulate pluming is done but no sticker on site
BLD-Framing/Rough-in7/3/20017/3/20017/3/2001PPASS
DetailsDave Hannah
shear nailing ###-#### reinspection ok to cover ext 7/3/2001 2:31:30 PM
BLD-Framing/Rough-in7/2/20017/2/20017/2/2001PFAIL
DetailsDave Hannah
shear nailing Dean ###-#### nailing was covered by a rap we cut baak several locations nailing was not quit there told dean to add one more 8 every 12 inches 7/2/2001 3:52:13 PM
BLD-Foundation5/10/20015/11/20015/11/2001APASS
DetailsDave Hannah
###-####