BLD-Final | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | PART |
Jim Storey
|
|
|
bruce ###-#### fn final ok upon pw sign off. 7/26/2002 4:21:43 PM
|
FIRE-Final Inspection | 7/26/2002 | 7/26/2002 | 7/26/2002 | A | PASS |
Rick Jackson
|
|
|
|
Permanent Occupancy | | 7/26/2002 | 7/26/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/23/2002 | 7/24/2002 | 7/24/2002 | A | NR |
Rick Jackson
|
|
|
tim ###-####
|
Code Occupancy Approval | 7/19/2002 | 7/19/2002 | 7/19/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
|
BLD-Framing/Rough-in | 6/5/2002 | 6/5/2002 | 6/5/2002 | P | PASS |
Jim Storey
|
|
|
###-#### fire stopping ok drops ok for cover. 6/5/2002 2:57:06 PM
|
BLD-Framing/Rough-in | 6/4/2002 | 6/4/2002 | 6/4/2002 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 09:31:16. Contact: . membrane penatrations in ceilling. center tower. 6/4/2002 2:38:07 PM
|
BLD-Framing/Rough-in | 6/3/2002 | 6/3/2002 | 6/3/2002 | P | PART |
Dave Hannah
|
|
|
###-#### BRUCE mec chases tower #1 ok to cover 6/3/2002 4:58:02 PM
|
BLD-Energy code compliance | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | PASS |
Jim Storey
|
|
|
TIM ###-#### c/n maDE OK 5/10/2002 3:52:54 PM
|
BLD-Framing/Rough-in | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | PART |
Jim Storey
|
|
|
fr cover ###-#### tim unuseable space behind tub needs 1 hr ceilling. 5/7/2002 4:37:33 PM
|
BLD-Framing/Rough-in | 5/3/2002 | 5/6/2002 | 5/6/2002 | P | NR |
Jim Storey
|
|
|
###-#### TIM ###-#### TIM c/n stands ok to insulate walls only. 5/6/2002 12:49:36 PM
|
BLD-Framing/Rough-in | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 07:48:43. Contact: ###-####.walked project with forman he made a list of items copy is on wall in office 5/3/2002 5:02:26 PM
|
BLD-Framing/Rough-in | 4/9/2002 | 4/9/2002 | 4/9/2002 | P | NR |
Jim Storey
|
|
|
john ###-#### fr
|
BLD-Framing/Rough-in | 2/15/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Jim Storey
|
|
|
shear wall john ###-#### 1st fl ok 2/19/2002 11:56:35 AM
|
BLD-Concrete | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PART |
Jim Storey
|
|
|
TIM ###-#### CONCRETE
|
BLD-Foundation | 1/22/2002 | 1/22/2002 | 1/22/2002 | P | PART |
Jim Sly
|
|
|
Found rebar appears OK.... Pass pending STRATA concrete PSI results. 1/22/2002 2:36:32 PM
|
BLD-Footing | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Conference | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | PASS |
Jim Storey
|
|
|
###-#### JOHN const. conf. 12/12/2001 10:30:37 AM
|