Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-00942
StatusFinaled
Name INLAND CONSTRUCTION
Site Address 390 W HALE ST
Project NameBROOKSIDE APARTMENTS
Customer Number 
ePlanReviewNo
Description
Building A1.1 * MODIFICATION 01/14.02 * To construct a new 17,631 sq.ft three story, wood framed, 18 unit apartment building. NOTE: This building is fully fire sprinklered per alternate signed & approved by Tim Hogland for second exit from the third floor. Each floor is 5,877 sq.ft. and contains 3- two bedroom, one bath units and 3- one bedroom, one bath units. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. CUP 00-00052 DRH 00-98 MJP PC # 02-027
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/26/20027/26/20027/26/2002PPART
DetailsJim Storey
bruce ###-#### fn final ok upon pw sign off. 7/26/2002 4:21:43 PM
FIRE-Final Inspection7/26/20027/26/20027/26/2002APASS
DetailsRick Jackson
Permanent Occupancy 7/26/20027/26/2002 DONE
Details
FIRE-Final Inspection7/23/20027/24/20027/24/2002ANR
DetailsRick Jackson
tim ###-####
Code Occupancy Approval7/19/20027/19/20027/19/2002PPASS
DetailsWm. Michael Meloy
BLD-Framing/Rough-in6/5/20026/5/20026/5/2002PPASS
DetailsJim Storey
###-#### fire stopping ok drops ok for cover. 6/5/2002 2:57:06 PM
BLD-Framing/Rough-in6/4/20026/4/20026/4/2002PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/04/2002 at 09:31:16. Contact: . membrane penatrations in ceilling. center tower. 6/4/2002 2:38:07 PM
BLD-Framing/Rough-in6/3/20026/3/20026/3/2002PPART
DetailsDave Hannah
###-#### BRUCE mec chases tower #1 ok to cover 6/3/2002 4:58:02 PM
BLD-Energy code compliance5/10/20025/10/20025/10/2002PPASS
DetailsJim Storey
TIM ###-#### c/n maDE OK 5/10/2002 3:52:54 PM
BLD-Framing/Rough-in5/7/20025/7/20025/7/2002PPART
DetailsJim Storey
fr cover ###-#### tim unuseable space behind tub needs 1 hr ceilling. 5/7/2002 4:37:33 PM
BLD-Framing/Rough-in5/3/20025/6/20025/6/2002PNR
DetailsJim Storey
###-#### TIM ###-#### TIM c/n stands ok to insulate walls only. 5/6/2002 12:49:36 PM
BLD-Framing/Rough-in5/3/20025/3/20025/3/2002PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/03/2002 at 07:48:43. Contact: ###-####.walked project with forman he made a list of items copy is on wall in office 5/3/2002 5:02:26 PM
BLD-Framing/Rough-in4/9/20024/9/20024/9/2002PNR
DetailsJim Storey
john ###-#### fr
BLD-Framing/Rough-in2/15/20022/19/20022/19/2002APART
DetailsJim Storey
shear wall john ###-#### 1st fl ok 2/19/2002 11:56:35 AM
BLD-Concrete2/12/20022/12/20022/12/2002PPART
DetailsJim Storey
TIM ###-#### CONCRETE
BLD-Foundation1/22/20021/22/20021/22/2002PPART
DetailsJim Sly
Found rebar appears OK.... Pass pending STRATA concrete PSI results. 1/22/2002 2:36:32 PM
BLD-Footing1/14/20021/15/20021/15/2002APASS
DetailsJim Storey
###-####
BLD-Conference12/11/200112/11/200112/11/2001PPASS
DetailsJim Storey
###-#### JOHN const. conf. 12/12/2001 10:30:37 AM