Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-00948
StatusFinaled
Name INLAND CONSTRUCTION
Site Address 378 W HALE ST
Project NameBROOKSIDE APARTMENTS
Customer Number 
ePlanReviewNo
Description
Building AR1.1 * MODIFICATION 01/14.02 * To construct a new 17,631 sq.ft three story, wood framed, 18 unit apartment building. NOTE: This building is fully fire sprinklered per alternate signed & approved by Tim Hogland for second exit from the third floor. Each floor is 5,877 sq.ft. and contains 3- two bedroom, one bath units and 3- one bedroom, one bath units. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. # 02-027 CUP 00-00052 DRH 00-98 MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval8/9/20028/9/20028/9/2002PPASS
DetailsWm. Michael Meloy
BLD-Final8/7/20028/8/20028/8/2002APART
DetailsJim Storey
###-#### BRUCE temp ok pending p&z sign off 8/8/2002 11:06:22 AM
Permanent Occupancy 8/8/20028/8/2002 DONE
Details
FIRE-Final Inspection8/6/20028/7/20028/7/2002APASS
DetailsRick Jackson
BRUCE; Phone #: ###-####
FIRE-Final Inspection8/2/20028/2/20028/2/2002PFAIL
DetailsRick Jackson
###-#### tim extinguishers 8/2/2002 4:17:33 PM
FIRE-Final Inspection7/31/20028/1/20028/1/2002AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 07/31/2002 at 11:21:54. Contact: ###-####. alarms not working and pretested; fire panel a mess; extinguishers not installed; two smoke detectors without AC power; sprinkler escutcheon in closet; covers on smoke detectors 8/1/2002 9:08:13 AM
BLD-Framing/Rough-in6/10/20026/11/20026/11/2002APASS
DetailsJim Storey
tim ###-####- soffett insp drops ok for cover. 6/11/2002 11:31:08 AM
BLD-Energy code compliance5/22/20025/22/20025/22/2002PPASS
DetailsJim Storey
1 st floor ok for cover
BLD-Framing/Rough-in5/22/20025/22/20025/22/2002PPASS
DetailsJim Storey
BRUCE ###-#### TIE DOWNS first floor c/n made ok 5/22/2002 2:53:58 PM
BLD-Energy code compliance5/20/20025/20/20025/20/2002PPART
DetailsJim Storey
tim- ###-#### insulation 2nd and trird floors ok for cover. 5/20/2002 2:54:37 PM
BLD-Energy code compliance5/16/20025/16/20025/16/2002PNR
DetailsJim Storey
###-#### tim
BLD-Framing/Rough-in5/14/20025/15/20025/15/2002APART
DetailsJim Storey
tim ###-#### fr tim ###-#### frgable truss non structral need repair/holddowns tighten nuts. 5/16/2002 7:47:27 AM
BLD-Concrete2/12/20022/12/20022/12/2002PPART
DetailsJim Storey
CONCRETE TIM ###-####
BLD-Foundation1/29/20021/30/20021/30/2002APASS
DetailsJim Storey
###-####
BLD-Footing1/22/20021/22/20021/22/2002PPART
DetailsJim Sly
Need Eng. OK for reduced footing size....2" less Width and depth. 1/22/2002 2:32:11 PM