Permit Information
Permit NumberBLD01-00986
StatusFinaled
Name CAROLLE SKOV
Site Address 2393 S GEKELER LN
Project NameHOUSE MOVE
Customer Number 
ePlanReviewNo
Description
To move single family dwelling from 133 Warm Springs and bring up to code at new location (2393 South Gekeler Lane) in accordance with owners agreement and $7000.00 bond on file (BND #01-00056). This structure will be set up over a new 1129 sq. ft. finished --(UNFINISHED 10/16/01)-- basement area. Additional work will include a 140 sq. ft. kitchen expansion at side of home, a 616 sq. ft. detached two car garage at rear of lot and interior remodel. Smoke detectors will be located on all levels and in every bedroom and hallway leading to the same. Hard-surfaced driveway will be maintained from street to detached garage. All work will be per approved plans and attached engineering. Proprietary inspection performed under MIS permit #00-00060. See comment in condition list for additional requirements. PC #268 DJO 10/16/01 BASEMENT TO BE UNFINISHED. A SEPARATE PERMIT NEEDED TO FINISHED BASEMENT. (FEES PAID FOR FINISHED BASEMENT) (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/31/20011/2/20021/2/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/31/2001 at 17:17:45. Contact: ###-####. final ok 1/2/2002 2:32:38 PM
BLD-Final12/31/20011/2/20021/2/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/31/2001 at 17:17:45. Contact: ###-####. final ok 1/2/2002 2:32:38 PM
BLD-Final12/27/200112/28/200112/28/2001AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/27/2001 at 13:35:31. Contact: ###-####.c/n posted. 12/28/2001 1:02:14 PM
BLD-Energy code compliance11/7/200111/8/200111/8/2001APASS
DetailsJim Storey
###-#### ROD
BLD-Framing/Rough-in11/2/200111/5/200111/5/2001PPASS
DetailsJim Storey
###-#### CAROL ok to insulate. 11/5/2001 4:48:55 PM
BLD-Framing/Rough-in10/12/200110/15/200110/15/2001APASS
DetailsJim Storey
SHEER WALL NAILING ###-#### ROD ok 10/15/2001 10:20:13 AM
BLD-Conference9/26/20019/27/20019/27/2001APASS
DetailsJim Storey
###-#### rod
BLD-Foundation8/28/20018/29/20018/29/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/28/2001 at 12:59:22. Contact: ###-####.
BLD-Foundation8/29/20018/29/20018/29/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/29/2001 at 10:51:00. Contact: ###-####.
BLD-Foundation8/29/20018/29/20018/29/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/29/2001 at 10:51:00. Contact: ###-####.
BLD-Footing8/27/20018/28/20018/28/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/27/2001 at 16:45:46. Contact: ###-####. 8/27/2001 11:20:34 PM WIP 8/27/2001 11:20:44 PM
BLD-Conference8/21/20018/21/20018/21/2001PDONE
DetailsSteven Webb
Scheduled by a contractor via Hello! on 08/21/2001 at 09:16:38. Contact: ###-####.
BLD-Foundation7/23/20017/23/20017/23/2001PPASS
DetailsJim Storey
Jim ###-#### walls ok 7/23/2001 9:41:32 AM
BLD-Footing7/10/20017/11/20017/11/2001APASS
DetailsSteven Webb
dane ###-#### reinspection Per approved plans 7/11/2001 11:58:58 AM
BLD-Footing7/10/20017/10/20017/10/2001ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/10/2001 at 07:10:02. Contact: ###-####.
BLD-Conference6/28/20016/28/20016/28/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/28/2001 at 00:39:01. Contact: ###-####.
BLD-Conference6/14/20016/15/20016/15/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/14/2001 at 22:22:17. Contact: ###-####.