BLD-Final | 7/12/2001 | 7/12/2001 | 7/12/2001 | P | PASS |
Jim Sly
|
|
|
FN JP-- ###-#### C/C issued. 7/12/2001 1:45:07 PM
|
BLD-Energy code compliance | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | PASS |
Russ Owen
|
|
|
JP-- ###-#### ENERGY CODE c/n posted the gas log has a correction on it posted by 411. i reposted new one at front window. ok to start rock. 1/5/2002 3:36:55 PM
|
BLD-Framing/Rough-in | 6/4/2001 | 6/4/2001 | 6/4/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/04/2001 at 07:14:40. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | CANC |
Russ Owen
|
|
|
JP ###-#### canc per cont. 12/31/2001 1:53:35 PM
|
BLD-Framing/Rough-in | 5/24/2001 | 5/25/2001 | 5/25/2001 | A | PART |
Jim Sly
|
|
|
jp ###-#### shear jp 941-1 shear ok 105 shear 5/25/2001 11:56:37 AM
|
BLD-Foundation | 5/8/2001 | 5/8/2001 | 5/8/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 05:23:52. Contact: ###-####. appears ok. 12/8/2001 10:16:38 AM
|
BLD-Footing | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | PART |
Dave Hannah
|
|
|
###-####
|