BLD-Final | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 09:39:31. Contact: ###-####. C/C issued. 8/31/2001 3:12:01 PM
|
BLD-Aging Inspection | 8/20/2001 | 8/20/2001 | 8/20/2001 | | PART |
Jim Sly
|
|
|
WIP 8/20/2001 8:21:51 AM
|
BLD-Wall cover | 6/19/2001 | 6/20/2001 | 6/20/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 17:28:08. Contact: ###-####.
|
BLD-Energy code compliance | 6/13/2001 | 6/15/2001 | 6/15/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/13/2001 at 16:43:53. Contact: ###-####. Should be frame....C/N...posted. 6/15/2001 4:17:39 PM
|
BLD-Framing/Rough-in | 6/8/2001 | 6/11/2001 | 6/11/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/08/2001 at 16:34:14. Contact: ###-####. Shear OK (less) interior shear ....Will check at frame. 6/11/2001 10:28:31 AM
|
BLD-Framing/Rough-in | 6/7/2001 | 6/8/2001 | 6/8/2001 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/07/2001 at 16:53:15. Contact: ###-####. need city stamped plans on site for inspection. 1/8/2002 3:57:59 PM
|
BLD-Foundation | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 16:50:37. Contact: ###-####. wip no city aprv plans on site told crew to check with blder 5/9/2001 11:05:43 AM
|
BLD-Footing | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 09:12:06. Contact: ###-####.
|