Permanent Occupancy | | 9/4/2007 | 9/4/2007 | | DONE |
|
|
|
|
BLD-Final | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | PASS |
Russ Owen
|
|
|
###-#### jerid please call before inspection.ok perm oc. 8/27/2001 3:47:39 PM
|
BLD-Final | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 8/27/2001 3:09:37 PM . ok perm oc. 8/27/2001 3:47:52 PM
|
BLD-Final | 8/21/2001 | 8/21/2001 | 8/21/2001 | P | PART |
Russ Owen
|
|
|
###-####. ok temp oc, need addnl tie downs as per plan. c/n posted. 8/21/2001 3:22:17 PM
|
BLD-Final | 8/17/2001 | 8/20/2001 | 8/20/2001 | A | FAIL |
Russ Owen
|
|
|
Jerard ###-####.needs zoning and fire/life inspections also, vent at exterior landing and access to insp blocking.8/20/2001 10:23:47 AM t 8/20/2001 10:23:50 AM 8/20/2001 10:24:21 AM
|
FIRE-Final Inspection | 8/20/2001 | 8/20/2001 | 8/20/2001 | P | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 8/20/2001 4:13:49 PM
|
FIRE-Final Inspection | 8/16/2001 | 8/16/2001 | 8/16/2001 | P | FAIL |
Joe Tawney
|
|
|
Reinsp Fail emergrency lights not operating 8/17/2001 3:59:58 PM
|
FIRE-Final Inspection | 7/27/2001 | 7/30/2001 | 7/30/2001 | A | CANC |
Joe Tawney
|
|
|
Cancel Alarm permit not on site 7/30/2001 9:52:43 AM
|
BLD-Other | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | CANC |
Russ Owen
|
|
|
###-#### drainage swells please call first. called contractor told them we do not handle drainage, need to call public works. 1/14/2002 12:24:54 PM
|