BLD-Final | 8/28/2001 | 8/29/2001 | 8/29/2001 | A | PASS |
Tony Young
|
|
|
|
BLD-Final | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | CANC |
Tony Young
|
|
|
###-#### CAMERON PLEASE CALL BEFORE GOING OUT CANCEL
|
BLD-Final | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | CANC |
Tony Young
|
|
|
###-#### CAMERON PLEASE CALL BEFORE GOING OUT
canc. per cameron 8/28/2001 12:23:52 PM
|
BLD-Final | 8/28/2001 | 8/28/2001 | 8/28/2001 | A | NR |
Tony Young
|
|
|
###-#### CAMERN
|
BLD-Energy code compliance | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 10:15:10. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/3/2001 | 7/3/2001 | 7/3/2001 | P | PASS |
Tony Young
|
|
|
###-####
ok to insulate, verify energy seal package 7/3/2001 3:17:12 PM
|
BLD-Framing/Rough-in | 6/26/2001 | 6/27/2001 | 6/27/2001 | P | PART |
Tony Young
|
|
|
reinspect shear nailing 6/26/2001 12:56:14 PMext. shear ok 6/27/2001 1:17:01 PM
ext. shear ok 6/27/2001 4:04:30 PM
|
BLD-Wall cover | 6/25/2001 | 6/26/2001 | 6/26/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 06/25/2001 at 14:57:37. Contact: ###-####.
c/n posted 6/26/2001 12:56:36 PM
|
BLD-Framing/Rough-in | 6/22/2001 | 6/22/2001 | 6/22/2001 | P | FAIL |
Carl Dependahl
|
|
|
shear Cameron ###-####; need stud for sthd's by windows at rear...fix & recall 6/22/2001 2:41:08 PM
|
BLD-Footing | 5/22/2001 | 5/22/2001 | 5/22/2001 | P | PART |
Tony Young
|
|
|
Cameron ###-#### please call before you go out
verbal corrections, ok after 5/22/2001 12:21:35 PM
|