BLD-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 | | PART |
Jim Sly
|
|
|
WIP 9/10/2001 8:33:04 AM
|
BLD-Final | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 9/10/2001 3:30:02 PM
|
BLD-Energy code compliance | 7/9/2001 | 7/10/2001 | 7/10/2001 | A | PASS |
Jim Sly
|
|
|
###-#### bill
|
BLD-Framing/Rough-in | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/3/2001 | 7/5/2001 | 7/5/2001 | A | FAIL |
Jim Sly
|
|
|
###-#### or ###-#### Need appr plans. 7/5/2001 9:07:55 AM
|
BLD-Framing/Rough-in | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | PART |
Jim Sly
|
|
|
bill Davis ###-#### Shear nailing OK.....C/N...HD's at 20" panel W. of Master closet window. 6/12/2001 2:48:02 PM
|
BLD-Foundation | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PART |
Dave Hannah
|
|
|
bob ###-#### wip 5/21/2001 2:02:55 PM
|
BLD-Footing | 5/17/2001 | 5/18/2001 | 5/18/2001 | A | PART |
Jim Sly
|
|
|
ft bob ###-####
|