BLD-Final | 12/17/2001 | 12/17/2001 | 12/17/2001 | P | PASS |
Dave Hannah
|
|
|
KELLY ###-#### c.c # 20988 issued 12/17/2001 1:51:48 PM
|
BLD-Final | 12/10/2001 | 12/10/2001 | 12/10/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### 12/10/2001 3:16:27 PM needs garage door loaded and elec final 12/10/2001 3:17:02 PM
|
BLD-Aging Inspection | 10/17/2001 | 10/17/2001 | 10/17/2001 | | DONE |
Dave Hannah
|
|
|
work in progress 10/17/2001 9:39:27 AM
|
BLD-Wall cover | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### kelly stohr c/n item completed ok to cover 8/17/2001 9:49:19 AM
|
BLD-Energy code compliance | 8/15/2001 | 8/15/2001 | 8/15/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 8/15/2001 2:21:10 PM
|
BLD-Framing/Rough-in | 8/14/2001 | 8/15/2001 | 8/15/2001 | P | FAIL |
Dave Hannah
|
|
|
nail north side of 3 ply truss 8/15/2001 2:20:54 PM
|
BLD-Framing/Rough-in | 7/30/2001 | 7/30/2001 | 7/30/2001 | P | NR |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/19/2001 | 7/20/2001 | 7/20/2001 | A | PART |
Dave Hannah
|
|
|
shear ###-#### shear nailing ok to cover ext walls 7/20/2001 11:37:44 AM
|
BLD-Framing/Rough-in | 7/20/2001 | 7/20/2001 | 7/20/2001 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 7/20/2001 11:41:03 AM fire wall between garage needs draft stops sheet rx and air space ok
|
BLD-Foundation | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | PART |
Dave Hannah
|
|
|
###-#### work in progress contractor has fix problem with setback now at 20 ft 6/11/2001 1:17:17 PM
|
BLD-Footing | 6/7/2001 | 6/8/2001 | 6/8/2001 | A | PART |
Russ Owen
|
|
|
###-#### subject to re-inspection to verify front set-back will be maintained at the 20 foot minimum requirement, contractor at site,now in process of corecting, at this time it is approx 6 in into the 20 foot required set back,job card has correction written on it. 1/8/2002 10:53:21 AM t this 1/8/2002 10:53:24 AM 1/8/2002 10:54:38 AM
|