BLD-Final | 1/3/2002 | 1/3/2002 | 1/3/2002 | P | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 1/3/2002 4:13:17 PM
|
BLD-Final | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### c/n on site 11/29/2001 3:36:16 PM
|
BLD-Aging Inspection | 10/23/2001 | 10/23/2001 | 10/23/2001 | | PART |
Jim Sly
|
|
|
WIP 10/23/2001 8:34:50 AM
|
BLD-Energy code compliance | 8/23/2001 | 8/23/2001 | 8/23/2001 | P | PASS |
Jim Sly
|
|
|
###-#### lorin Frame OK 8/23/2001 2:23:07 PM
|
BLD-Energy code compliance | 8/21/2001 | 8/22/2001 | 8/22/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/21/2001 at 22:07:34. Contact: ###-####. Complete C/N 8/22/2001 1:57:25 PM
|
BLD-Framing/Rough-in | 8/20/2001 | 8/21/2001 | 8/21/2001 | A | FAIL |
Jim Sly
|
|
|
###-#### loran C/N 8/21/2001 9:16:31 AM
|
BLD-Wall cover | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 11:18:05. Contact: ###-####. Shear OK. 8/3/2001 9:06:44 AM
|
BLD-Aging Inspection | 7/24/2001 | 7/24/2001 | 7/24/2001 | | PART |
Jim Sly
|
|
|
Still Framing. 7/24/2001 10:21:29 AM
|
BLD-Foundation | 5/23/2001 | 5/24/2001 | 5/24/2001 | A | PASS |
Jim Sly
|
|
|
Ed ###-#### wait for the tone 05213
|
BLD-Footing | 5/21/2001 | 5/23/2001 | 5/23/2001 | A | PART |
Jim Sly
|
|
|
###-####
|