BLD-Final | 7/20/2001 | 7/23/2001 | 7/23/2001 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Energy code compliance | 6/20/2001 | 6/20/2001 | 6/20/2001 | P | PASS |
Jim Sly
|
|
|
###-#### CHUCK Frame pass 6/20/2001 2:05:55 PM
|
BLD-Framing/Rough-in | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PASS |
Dave Hannah
|
|
|
shear wall chuck ###-#### ok to cover ext a 6/19/2001 3:38:12 PM walls 6/19/2001 3:38:18 PM
|
BLD-Framing/Rough-in | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | FAIL |
Dave Hannah
|
|
|
chuck ###-#### 6/19/2001 3:43:00 PM c/n on site ok to insulate 6/19/2001 3:43:16 PM
|
BLD-Foundation | 5/24/2001 | 5/24/2001 | 5/24/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 06:46:28. Contact: ###-####.
|
BLD-Footing | 5/22/2001 | 5/23/2001 | 5/23/2001 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/22/2001 at 17:36:10. Contact: ###-####.
|