BLD-Final | 3/14/2002 | 3/15/2002 | 3/15/2002 | A | PASS |
Tony Young
|
|
|
###-#### TRAVIS GARAGE CODE 0912
|
BLD-Final | 3/13/2002 | 3/14/2002 | 3/14/2002 | A | FAIL |
Dave Hannah
|
|
|
###-#### garage code 0912 c/n on site 3/14/2002 11:23:21 AM
|
BLD-Aging Inspection | 1/14/2002 | 1/14/2002 | 1/14/2002 | | PART |
Tony Young
|
|
|
wip? 1/14/2002 10:33:18 AM
|
BLD-Aging Inspection | 11/12/2001 | 11/12/2001 | 11/12/2001 | | PART |
Tony Young
|
|
|
wip? 11/13/2001 1:01:40 PM
|
BLD-Final | 7/18/2001 | 9/10/2001 | 9/10/2001 | A | FAIL |
Tony Young
|
|
|
###-####
not even close for inspection, RI fee imposed, no inspection made 9/10/2001 11:57:30 AM
|
BLD-Framing/Rough-in | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Energy code compliance | 7/18/2001 | 7/30/2001 | 7/30/2001 | A | FAIL |
Tony Young
|
|
|
###-####
c/n not done yet, insulation is not done, called builder to notify, he will recall after fix, reinspection fee will be imposed next time. 7/30/2001 10:51:34 AM
|
BLD-Framing/Rough-in | 7/18/2001 | 7/27/2001 | 7/27/2001 | A | PART |
Tony Young
|
|
|
###-####
c/n posted// 8 items, ok to insulate 7/27/2001 10:26:48 AM
|
BLD-Framing/Rough-in | 7/18/2001 | 7/19/2001 | 7/19/2001 | A | PART |
Tony Young
|
|
|
###-####
ok to side w/ marked corrections on shear, t/w sider, he said he will nail as he goes up, need to block and nail panel to left of front garage door also 7/19/2001 10:31:23 AM
|
BLD-Framing/Rough-in | 7/9/2001 | 7/12/2001 | 7/12/2001 | A | FAIL |
Tony Young
|
|
|
###-####
not ready, next time re inspection fee will be imposed 7/12/2001 10:02:50 AM
|
BLD-Foundation | 6/22/2001 | 6/22/2001 | 6/22/2001 | P | PART |
Tony Young
|
|
|
Ronald ###-#### early pm...
wip, ok when ready 6/22/2001 1:30:01 PM
|
BLD-Footing | 6/20/2001 | 6/21/2001 | 6/21/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 06/20/2001 at 13:50:22. Contact: ###-####.
just setting forms, verbal warnings about proprty lines, etc. 6/21/2001 9:45:59 AM
|