BLD-Aging Inspection | 1/1/2002 | 1/1/2002 | 1/7/2002 | | NR |
Carl Dependahl
|
|
|
wip 1/7/2002 7:51:06 AM
|
BLD-Final | 10/31/2001 | 11/1/2001 | 11/1/2001 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/31/2001 at 09:43:16. Contact: ###-####. Electrical final is needed prior to structural. 11/1/2001 11:14:31 AM
|
BLD-Final | 10/29/2001 | 10/31/2001 | 10/31/2001 | A | FAIL |
Russ Owen
|
|
|
###-####. Left c/n on front door, to recall after ele has been finaled also left note to check for smoke detector req as code requires in existing constrution as written on permit. No one home at this time. 10/31/2001 12:10:51 PM left 10/31/2001 12:10:59 PM 10/31/2001 12:11:58 PM
|
BLD-Aging Inspection | 9/25/2001 | 9/25/2001 | 9/25/2001 | | NR |
Carl Dependahl
|
|
|
repair job, expires 11-17-01 9/25/2001 5:02:27 PM
|
BLD-Aging Inspection | 7/26/2001 | 7/26/2001 | 7/26/2001 | | PASS |
Carl Dependahl
|
|
|
wip 7/30/2001 8:00:15 AM
|
BLD-Framing/Rough-in | 5/16/2001 | 5/17/2001 | 5/17/2001 | A | PASS |
Tony Young
|
|
|
please call first Perry ###-####
ok to cover framing w/ verbal corrections 5/17/2001 1:39:17 PM
|
BLD-Conference | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PASS |
Tony Young
|
|
|
Perry ###-####
conf. on framing, extent of project, fire blocks, draft stops, etc. 5/8/2001 2:19:23 PM
|