BLD-Final | 7/31/2001 | 7/31/2001 | 7/31/2001 | P | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 7/31/2001 2:39:57 PM
|
BLD-Energy code compliance | 6/26/2001 | 6/27/2001 | 6/27/2001 | A | PASS |
Dave Hannah
|
|
|
Chuck ###-####
|
BLD-Framing/Rough-in | 6/26/2001 | 6/27/2001 | 6/27/2001 | A | PASS |
Dave Hannah
|
|
|
Chuck ###-#### 6/27/2001 11:30:41 AM
|
BLD-Framing/Rough-in | 6/27/2001 | 6/27/2001 | 6/27/2001 | P | PASS |
Jim Sly
|
|
|
Chuck ###-#### Frame and energy passed by 425 6/27/2001 1:15:59 PM 6/27/2001 1:16:51 PM
|
BLD-Framing/Rough-in | 6/25/2001 | 6/26/2001 | 6/26/2001 | A | PASS |
Jim Sly
|
|
|
and shear panel Cheuck ###-####
|
BLD-Foundation | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Footing | 6/4/2001 | 6/4/2001 | 6/4/2001 | P | PART |
Dave Hannah
|
|
|
###-#### work in progress set backs are ok 6/4/2001 1:37:30 PM
|