BLD-Final | 7/20/2001 | 7/23/2001 | 7/23/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### c.c # 20376 issued 7/23/2001 2:35:02 PM
|
BLD-Framing/Rough-in | 6/25/2001 | 6/25/2001 | 6/25/2001 | P | PASS |
Jim Sly
|
|
|
shear reinspection chuck ###-####
|
BLD-Framing/Rough-in | 6/25/2001 | 6/25/2001 | 6/25/2001 | P | PASS |
Jim Sly
|
|
|
reinspection chuck ###-####
|
BLD-Framing/Rough-in | 6/22/2001 | 6/22/2001 | 6/22/2001 | P | FAIL |
Jim Sly
|
|
|
J P -- ###-#### FR C/N posted. 6/22/2001 2:23:01 PM
|
BLD-Framing/Rough-in | 6/20/2001 | 6/20/2001 | 6/20/2001 | P | FAIL |
Jim Sly
|
|
|
SHEAR NAIL ###-#### Nail shear panels 6/20/2001 2:24:49 PM
|
BLD-Energy code compliance | 6/7/2001 | 6/7/2001 | 6/7/2001 | P | CANC |
Dave Hannah
|
|
|
Chuck ###-####
|
BLD-Foundation | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Footing | 6/4/2001 | 6/4/2001 | 6/4/2001 | P | PART |
Jim Sly
|
|
|
Jerry ###-####
|