BLD-Final | 1/18/2013 | 1/18/2013 | 1/18/2013 | P | PASS |
Tony Young
|
|
|
becky Phone #: ###-####
|
DOC - Permit Finaled | 1/18/2013 | 1/18/2013 | 1/18/2013 | P | PASS |
Tony Young
|
|
|
c of c issued
|
BLD-Final | 1/17/2013 | 1/17/2013 | 1/18/2013 | P | PART |
Tony Young
|
|
|
becky Phone #: ###-####,, ok pending elec
|
BLD-Conference | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | PART |
Tony Young
|
|
|
###-#### dale
ok to keep working on shop,,,, 90 days 7/30/2002 3:15:30 PM
|
BLD-Final | 12/26/2001 | 12/27/2001 | 12/27/2001 | P | PART |
Tony Young
|
|
|
###-####
c of c issued, shop not 100% done yet 12/28/2001 1:16:28 PM
|
BLD-Framing/Rough-in | 11/16/2001 | 11/16/2001 | 11/16/2001 | P | PASS |
Tony Young
|
|
|
DALE ###-####
|
BLD-Framing/Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | FAIL |
Tony Young
|
|
|
###-#### dale call first
need trades signed off, framing ok to cover after 11/13/2001 4:08:25 PM
|
BLD-Framing/Rough-in | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PART |
Tom Arcoraci
|
|
|
SHEER WALL DETACHED GARAGE ok to side garage 9/25/2001 9:13:21 AM
|
BLD-Energy code compliance | 9/4/2001 | 9/4/2001 | 9/4/2001 | P | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 9/4/2001 | 9/4/2001 | 9/4/2001 | P | PASS |
Tony Young
|
|
|
HOUSE FRAMING OK 9/4/2001 3:51:26 PM
|
BLD-Conference | 8/30/2001 | 8/30/2001 | 8/30/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/30/2001 9:46:36 AM w/ 415 re "courtesy insp" c/n at site.
|
BLD-Framing/Rough-in | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | PART |
Tony Young
|
|
|
###-####////met w/ #340
c/n on front porch posts, house framing only, ok to insulate, verify straps and draft stops later at energy code inspection 8/30/2001 9:58:50 AM
|
BLD-Conference | 8/29/2001 | 8/29/2001 | 8/29/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/29/2001 12:46:14 PM w/ supt re insp, keep c/n, recall.
|
BLD-Framing/Rough-in | 8/27/2001 | 8/28/2001 | 8/29/2001 | P | FAIL |
Carl Dependahl
|
|
|
FR STEVE ###-#### c/n, plans, calcs & eng'g; left courtesy correction list. no insulation 8/29/2001 12:31:57 PM
|
BLD-Framing/Rough-in | 8/9/2001 | 8/14/2001 | 8/14/2001 | A | PART |
Tony Young
|
|
|
shear ###-####
shear ok 8/14/2001 12:29:18 PM
|
BLD-Foundation | 8/1/2001 | 8/1/2001 | 8/1/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 08:06:18. Contact: ###-####.garage ftg and stem wall ok 8/1/2001 3:00:06 PM
|
BLD-Footing | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/30/2001 at 17:08:24. Contact: ###-####.ok w/ verbal corrections 7/31/2001 9:43:05 AM
|
BLD-Foundation | 6/26/2001 | 6/27/2001 | 6/27/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 06/26/2001 at 16:38:47. Contact: ###-####.wip 6/27/2001 11:07:12 AM
|
BLD-Footing | 6/25/2001 | 6/26/2001 | 6/26/2001 | A | PART |
Tony Young
|
|
|
Chris ###-####
verbal corrections on depth and rebar locatins 6/26/2001 11:04:22 AM
|