BLD-Final | 5/9/2003 | 5/12/2003 | 5/12/2003 | P | PASS |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c.c # 22914 issued 5/12/2003 2:20:57 PM
|
BLD-Grading Inspection | 5/12/2003 | 5/12/2003 | 5/12/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is approved.
|
BLD-Final | 3/11/2003 | 3/12/2003 | 3/12/2003 | P | NR |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore please call for access 3/12/2003 2:56:24 PM needs terry records sign off 3/12/2003 4:49:01 PM
|
BLD-Final | 8/14/2002 | 8/15/2002 | 8/15/2002 | P | FAIL |
Tony Young
|
|
|
###-#### mike
c/n posted 8/15/2002 3:51:59 PM
|
BLD-Final | 8/6/2002 | 8/9/2002 | 8/9/2002 | P | NR |
Russ Owen
|
|
|
MIKE ###-#### CELL ###-#### ACCESS CODE 1234 ENTER TO OPEN GARAGE PLEASE CALL 1ST Needs all trade sign-offs prior to building final. Informed buider via telephone--mike. Will re-call when ready. 8/9/2002 2:33:01 PM
|
BLD-Aging Inspection | 1/21/2002 | 1/21/2002 | 1/21/2002 | | PART |
Tony Young
|
|
|
|
BLD-Energy code compliance | 11/21/2001 | 11/21/2001 | 11/21/2001 | P | PASS |
Tony Young
|
|
|
###-####
c/n ok 11/21/2001 1:39:01 PM
|
BLD-Final | 11/16/2001 | 11/16/2001 | 11/16/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by Inspector: 415 On 11/16/2001 11:48:55 AM ok to insulate need 3 ply girder nailled 3@ 4 inches bc./ and heat in water closet under stairs with 20 min door assemblie. 11/16/2001 2:23:51 PM
|
BLD-Framing/Rough-in | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | CANC |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/14/2001 | 11/15/2001 | 11/15/2001 | P | FAIL |
Jim Storey
|
|
|
###-#### c/n posted on site. 11/15/2001 3:13:26 PM
|
BLD-Conference | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | PASS |
Tony Young
|
|
|
###-####shear ok 11/14/2001 2:07:19 PM
|
BLD-Framing/Rough-in | 11/12/2001 | 11/13/2001 | 11/13/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 16:27:51. Contact: ###-####.
need to have eng. verify as built on shear or give fixes 11/13/2001 12:25:30 PM
|
BLD-Foundation | 10/5/2001 | 10/8/2001 | 10/8/2001 | P | PART |
Tom Arcoraci
|
|
|
michael ###-#### found wall PWI 10/8/2001 4:16:29 PM
|
BLD-Footing | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### MIKE
|
BLD-Aging Inspection | 9/24/2001 | 9/24/2001 | 9/24/2001 | | PART |
Tony Young
|
|
|
wip 9/27/2001 4:54:13 PM
|
BLD-Foundation | 7/20/2001 | 7/23/2001 | 7/23/2001 | P | PART |
Tony Young
|
|
|
###-####
|
BLD-Footing | 7/19/2001 | 7/19/2001 | 7/19/2001 | P | PART |
Tony Young
|
|
|
###-####
wip, verbal warnings 7/19/2001 4:13:37 PM
|
BLD-Grading Inspection | 7/18/2001 | 7/18/2001 | 7/18/2001 | | PASS |
Rita DeYoung
|
|
|
footing subgrade has been approved by the geotechnical engineer.
|
BLD-Footing | 7/13/2001 | 7/13/2001 | 7/13/2001 | P | FAIL |
Tony Young
|
|
|
###-#### michael ft
engineering problems, had to pull off until fix is designed 7/13/2001 1:02:30 PM
|