BLD-Final | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | FAIL |
Dave Hannah
|
|
|
###-#### JOHN post address seal all ext outlet wall boxes 11/6/2001 10:05:06 AM
|
BLD-Final | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | PASS |
Russ Owen
|
|
|
JOHN ###-#### ok c of c. 11/6/2001 5:14:56 PM
|
BLD-Framing/Rough-in | 10/12/2001 | 10/12/2001 | 10/12/2001 | P | PASS |
Jim Storey
|
|
|
SHEER WALL ###-#### JOHN ceillings of carports nailling ok 10/12/2001 2:27:01 PM
|
BLD-Framing/Rough-in | 9/21/2001 | 9/21/2001 | 9/21/2001 | P | PASS |
Steven Webb
|
|
|
shear john ###-#### Interior shear 9/21/2001 2:35:22 PM
|
BLD-Energy code compliance | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PASS |
Jim Storey
|
|
|
###-#### c/n made ok/ frame and ec ok for cover / need gyp sheer insp. 9/17/2001 5:25:40 PM
|
BLD-Framing/Rough-in | 9/11/2001 | 9/12/2001 | 9/12/2001 | A | FAIL |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 8/20/2001 | 8/20/2001 | 8/20/2001 | P | PART |
Jim Storey
|
|
|
###-#### john sheer ok 8/20/2001 2:35:09 PM
|
BLD-Framing/Rough-in | 8/16/2001 | 8/16/2001 | 8/16/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-#### john complete nailing, need plans 8/16/2001 3:14:26 PM
|
BLD-Framing/Rough-in | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PASS |
Jim Storey
|
|
|
fire wall john ###-#### 2nd floor wall ok. 8/7/2001 2:48:10 PM
|
BLD-Framing/Rough-in | 7/3/2001 | 7/3/2001 | 7/3/2001 | P | PART |
Carl Dependahl
|
|
|
fire wall ###-#### add gyp at floor lines, ok to continue to 2nd fl. 7/3/2001 3:24:54 PM
|
BLD-Footing | 6/25/2001 | 6/25/2001 | 6/25/2001 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Footing | 6/15/2001 | 6/18/2001 | 6/18/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### poured without inspection 6/17/2001 10:26:34 PM
|