BLD-Final | 2/20/2002 | 2/21/2002 | 2/21/2002 | P | PASS |
Tom Arcoraci
|
|
|
fn occ mark--###-####
|
BLD-Final | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | CANC |
Jim Storey
|
|
|
###-#### mark please call 1st
|
BLD-Other | 2/20/2002 | 2/20/2002 | 2/20/2002 | | DONE |
|
|
|
Cashier's check for $907 posted to cover drainage & revegetation requirements.
|
BLD-Grading Inspection | 2/12/2002 | 2/12/2002 | 2/12/2002 | | BOND |
Rita DeYoung
|
|
|
Rough grading is complete. Fine grading and revegetation is not. Upon receipt of a $907.50 bond for revegetation and fine grading the grading and drainage is conditionally approved.
|
BLD-Conference | 2/8/2002 | 2/11/2002 | 2/11/2002 | A | FAIL |
Tony Young
|
|
|
###-####
conf. on fp, no permit no draft stop @ ceiling line, insulation around vent 2/11/2002 11:55:42 AM
|
BLD-Conference | 2/7/2002 | 2/8/2002 | 2/8/2002 | P | PASS |
Tony Young
|
|
|
###-#### MARK
conf. on final 2/8/2002 3:17:13 PM
|
BLD-Aging Inspection | 1/9/2002 | 1/9/2002 | 1/9/2002 | | PART |
Tony Young
|
|
|
wip 1/9/2002 10:37:22 AM
|
BLD-Energy code compliance | 11/8/2001 | 11/9/2001 | 11/9/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/08/2001 at 13:56:44. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/6/2001 | 11/7/2001 | 11/7/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/06/2001 at 09:29:58. Contact: ###-####.c/n on site ok to insulate 11/7/2001 3:42:12 PM
|
BLD-Framing/Rough-in | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | NR |
Tony Young
|
|
|
###-#### call first
|
BLD-Framing/Rough-in | 10/4/2001 | 10/4/2001 | 10/4/2001 | P | PART |
Tony Young
|
|
|
###-#### mark
ext. shear ok 10/4/2001 2:30:02 PM
|
BLD-Framing/Rough-in | 10/2/2001 | 10/3/2001 | 10/3/2001 | P | FAIL |
Tony Young
|
|
|
###-#### mark \\call first
not ready, conf. on frame 10/3/2001 2:44:11 PM
|
BLD-Aging Inspection | 10/2/2001 | 10/2/2001 | 10/2/2001 | | PASS |
Tony Young
|
|
|
wip 10/2/2001 8:34:13 AM
|
BLD-Concrete | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 10:03:13. Contact: .
wip, verbal warnings/ corrections 8/2/2001 2:11:51 PM
|
BLD-Footing | 7/20/2001 | 7/20/2001 | 7/20/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/20/2001 at 07:17:52. Contact: ###-####.
wip, verbal corrections/ warnings on depth, rebar location, etc. 7/20/2001 11:33:12 AM
|
BLD-Grading Inspection | 7/18/2001 | 7/18/2001 | 7/18/2001 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer.
|