BLD-Final | 9/28/2001 | 10/1/2001 | 10/1/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/28/2001 at 12:09:56. Contact: ###-####. C/C issued. 10/1/2001 9:33:54 AM
|
BLD-Aging Inspection | 9/14/2001 | 9/14/2001 | 9/14/2001 | | PART |
Jim Sly
|
|
|
WIP 9/14/2001 9:19:17 AM
|
BLD-Framing/Rough-in | 7/13/2001 | 7/13/2001 | 7/13/2001 | P | PASS |
Jim Sly
|
|
|
Bob ###-#### Energy Pass 7/13/2001 2:10:30 PM
|
BLD-Framing/Rough-in | 7/11/2001 | 7/12/2001 | 7/12/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### C/N posted. 7/12/2001 3:23:25 PM
|
BLD-Framing/Rough-in | 7/2/2001 | 7/5/2001 | 7/5/2001 | A | NR |
Jim Sly
|
|
|
###-#### NR 7/5/2001 8:50:43 AM
|
BLD-Framing/Rough-in | 7/5/2001 | 7/5/2001 | 7/5/2001 | P | PART |
Jim Sly
|
|
|
###-#### Shear OK. 7/5/2001 3:55:34 PM
|
BLD-Foundation | 6/8/2001 | 6/11/2001 | 6/11/2001 | A | PASS |
Jim Sly
|
|
|
jed ###-####--found
|
BLD-Footing | 6/7/2001 | 6/8/2001 | 6/8/2001 | P | PART |
Russ Owen
|
|
|
joe ###-####
|