BLD-Final | 12/10/2001 | 12/11/2001 | 12/11/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 12:18:17. Contact: ###-####. C/C issued. 12/11/2001 10:22:31 AM
|
BLD-Aging Inspection | 10/24/2001 | 10/24/2001 | 10/24/2001 | | PART |
Jim Sly
|
|
|
WIP 10/24/2001 4:18:51 PM
|
BLD-Energy code compliance | 8/24/2001 | 8/24/2001 | 8/24/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/24/2001 at 08:33:08. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/22/2001 | 8/22/2001 | 8/22/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 08:11:23. Contact: ###-####.
|
BLD-Other | 8/6/2001 | 8/7/2001 | 8/7/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 20:56:31. Contact: ###-####. Shear OK 8/7/2001 9:29:44 AM
|
BLD-Other | 8/6/2001 | 8/6/2001 | 8/6/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 08:16:00. Contact: ###-####. C/N for shear No (2) studs at straps, Tecos in straps, No nailing to (2) studs, Need blocking. Need appr plans....Eng for HD connect to shear panel ...Not done 8/6/2001 2:11:08 PM
|
BLD-Other | 8/3/2001 | 8/3/2001 | 8/3/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 07:33:00. Contact: ###-####. NR 8/3/2001 5:47:13 PM
|
BLD-Foundation | 7/2/2001 | 7/3/2001 | 7/3/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/02/2001 at 06:47:20. Contact: ###-####.
|
BLD-Footing | 7/2/2001 | 7/2/2001 | 7/2/2001 | A | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/02/2001 at 06:46:37. Contact: ###-####.cancelled by contractor 7/2/2001 11:47:03 AM
|