BLD-Final | 8/20/2001 | 8/20/2001 | 8/20/2001 | P | PASS |
Jim Sly
|
|
|
plumbing finaled 8/3/01 ###-#### C/C issued. 8/20/2001 2:27:03 PM
|
BLD-Framing/Rough-in | 7/12/2001 | 7/12/2001 | 7/12/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/12/2001 at 06:35:18. Contact: ###-####. Energy Pass 7/12/2001 11:18:01 AM
|
BLD-Framing/Rough-in | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | FAIL |
Dave Hannah
|
|
|
jp ###-#### fr--shear insp c/n on site 7/10/2001 3:11:25 PM
|
BLD-Foundation | 6/13/2001 | 6/13/2001 | 6/13/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/13/2001 at 05:07:08. Contact: ###-####.
|
BLD-Footing | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | PASS |
Jim Sly
|
|
|
###-#### Ryan
|