BLD-Final | 6/3/2002 | 6/3/2002 | 6/3/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 08:01:56. Contact: ###-####.
|
BLD-Wall cover | 12/19/2001 | 12/20/2001 | 12/20/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 16:26:45. Contact: ###-####.
|
BLD-Aging Inspection | 10/11/2001 | 10/11/2001 | 10/11/2001 | | NR |
Jim Storey
|
|
|
wip 10/11/2001 4:00:32 PM
|
BLD-Framing/Rough-in | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 11:42:36. Contact: ###-####. brace pannel nailling ok fo cover. 8/10/2001 4:54:04 PM
|
BLD-Footing | 6/27/2001 | 6/28/2001 | 6/28/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/27/2001 at 17:10:14. Contact: .contractor just showed up at 2:15 ,said he has mud schedualed for 3:00,told him id come back latter went over set backs .. 6/28/2001 3:49:04 PM 6/28/2001 3:49:18 PM
|
BLD-Footing | 6/28/2001 | 6/28/2001 | 6/28/2001 | P | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 6/28/2001 3:51:42 PM now 3:45 has been poured set backs ok and verts visible along with top bar which will be in wall.
|