BLD-Final | 3/10/2003 | 3/10/2003 | 3/10/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/10/2003 at 9:43:39 AM. Contact: ###-####. C/C issued. 3/10/2003 2:39:40 PM
|
BLD-Final | 8/9/2002 | 8/13/2002 | 8/13/2002 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 12:30:36. Contact: 208- ###-#### C/N....Need temp glass within 24" rear door. 8/13/2002 11:24:51 AM
|
BLD-Final | 1/28/2002 | 1/31/2002 | 1/31/2002 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 17:15:18. Contact: ###-####. BOB..needs ele insp. 1/31/2002 2:12:37 PM
|
BLD-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 | | PART |
Jim Sly
|
|
|
Electr Needs final....Talked to John ###-####.....Will follow up on (home owner) Electr permit to final. 1/14/2002 9:43:26 AM
|
BLD-Aging Inspection | 11/5/2001 | 11/5/2001 | 11/5/2001 | | PART |
Jim Sly
|
|
|
WIP 11/5/2001 9:51:05 AM
|
BLD-Aging Inspection | 9/5/2001 | 9/5/2001 | 9/5/2001 | | PART |
Jim Sly
|
|
|
WIP 9/7/2001 8:26:22 AM Called contr. 9/7/2001 8:27:32 AM
|
BLD-Framing/Rough-in | 7/6/2001 | 7/6/2001 | 7/6/2001 | P | PASS |
Jim Sly
|
|
|
John ###-####
|
BLD-Footing | 7/2/2001 | 7/3/2001 | 7/3/2001 | P | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 6/11/2001 | 6/13/2001 | 6/13/2001 | A | CANC |
Jim Sly
|
|
|
John ###-####
|
BLD-Footing | 6/13/2001 | 6/13/2001 | 6/13/2001 | P | PART |
Jim Sly
|
|
|
todd ###-#### Footing OK 6/13/2001 3:01:49 PM
|