BLD-Final | 12/27/2001 | 12/27/2001 | 12/27/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 04:03:17. Contact: . C/C issued. 12/27/2001 10:14:39 AM
|
BLD-Final | 12/21/2001 | 12/21/2001 | 12/21/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/21/2001 at 10:39:27. Contact: ###-####. C/N posted. 12/21/2001 2:01:07 PM
|
BLD-Final | 12/19/2001 | 12/20/2001 | 12/20/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 12:02:29. Contact: ###-####.
|
BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/10/2001 | | PART |
Jim Sly
|
|
|
WIP 12/11/2001 10:29:09 AM
|
BLD-Wall cover | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 08:59:56. Contact: . FRAME and ENERGY PASS 10/9/2001 3:14:06 PM
|
BLD-Framing/Rough-in | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/04/2001 at 13:56:40. Contact: ###-####. C/N...Need......NR. 10/4/2001 2:56:26 PM
|
BLD-Framing/Rough-in | 10/4/2001 | 10/5/2001 | 10/5/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/04/2001 at 16:36:57. Contact: ###-####. C/N shear C/N frame on site. 10/5/2001 3:17:10 PM
|
BLD-Framing/Rough-in | 9/21/2001 | 9/24/2001 | 9/24/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/21/2001 at 09:57:42. Contact: ###-####. Shear nailing OK.....C/N for missed HD. 9/24/2001 9:11:28 AM
|
BLD-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 | | PART |
Jim Sly
|
|
|
WIP 9/10/2001 8:28:11 AM
|
BLD-Foundation | 7/9/2001 | 7/9/2001 | 7/9/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 07:12:23. Contact: ###-####.
|
BLD-Footing | 7/2/2001 | 7/2/2001 | 7/2/2001 | P | PART |
Jim Sly
|
|
|
robert ###-####
|