BLD-Final | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | PASS |
Jim Sly
|
|
|
BILL ###-#### C/C issued. 10/16/2001 3:12:32 PM
|
BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 | | PART |
Jim Sly
|
|
|
WIP 10/15/2001 9:44:12 AM
|
BLD-Energy code compliance | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PASS |
Jim Sly
|
|
|
###-#### bill
|
BLD-Framing/Rough-in | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PASS |
Jim Sly
|
|
|
bill- ###-#### fr insp
|
BLD-Framing/Rough-in | 7/18/2001 | 7/19/2001 | 7/19/2001 | A | PASS |
Russ Owen
|
|
|
shear Jim ###-####ok to side needs 2 ret-ros hds at left bathroom wall. 7/19/2001 10:24:29 AM 7/19/2001 10:24:52 AM
|
BLD-Foundation | 7/2/2001 | 7/3/2001 | 7/3/2001 | A | PASS |
Jim Sly
|
|
|
Bob ###-####
|
BLD-Footing | 7/1/2001 | 7/2/2001 | 7/2/2001 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/01/2001 at 18:14:14. Contact: ###-####.
|
BLD-Foundation | 6/26/2001 | 6/26/2001 | 6/26/2001 | P | PART |
Jim Sly
|
|
|
Cal ###-#### Bsmnt wall 6/26/2001 3:04:09 PM
|
BLD-Footing | 6/22/2001 | 6/25/2001 | 6/25/2001 | A | PART |
Jim Sly
|
|
|
Bob ###-####
|