BLD-Final | 8/13/2002 | 8/13/2002 | 8/13/2002 | P | PASS |
Russ Owen
|
|
|
|
FIRE-Final Inspection | 8/12/2002 | 8/12/2002 | 8/12/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
FIRE-Final Inspection | 8/12/2002 | 8/12/2002 | 8/12/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
FIRE-Final Inspection | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | PART |
Troy Cobbley
|
|
|
temporary occupancy given for the pool per dave miller with the boise fire dept. The temporary occupancy is good until the 12th of august unless an extension is given by dave miller. Under no circumstances is the temp for the main structur to extend beyond the original experation date 7/31/2002 4:13:27 PM
|
BLD-Conference | 7/30/2002 | 7/30/2002 | 7/30/2002 | A | PART |
Russ Owen
|
|
|
Issue 5 day N&O requireing CO. Talked with Clay about obtaining final he will comply, only missing fire at this time. 7/31/2002 12:08:51 PM
|
BLD-Conference | 7/24/2002 | 7/24/2002 | 7/24/2002 | P | DONE |
Troy Cobbley
|
|
|
I spoke to Gabe (Hilton Garden Manager) and told him that a sign off for the swimming pool and the main building was still needed. I asked him to please call in for the swimming pool inspection within 48 hours
|