BLD-Aging Inspection | 1/14/2002 | 1/14/2002 | 1/15/2002 | | PASS |
Carl Dependahl
|
|
|
no call since 7-13-01 1/15/2002 9:37:51 AM
|
BLD-Aging Inspection | 11/14/2001 | 11/14/2001 | 11/14/2001 | | NR |
Carl Dependahl
|
|
|
wip, fnd upgrade, int supports to be chk'd at final 11/14/2001 9:31:24 AM
|
BLD-Aging Inspection | 9/14/2001 | 9/14/2001 | 9/18/2001 | | NR |
Carl Dependahl
|
|
|
foundation upgrade...has c/n. WIP 9/18/2001 1:47:39 PM
|
BLD-Footing | 7/12/2001 | 7/13/2001 | 7/13/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/12/2001 at 12:43:08. Contact: ###-####. walls 70 percent poured. Talked with contractor about replacing some rotted wood at the perimeter,he said owner was going to perform this. 7/13/2001 10:18:59 AM 7/13/2001 10:19:26 AM
|
BLD-Footing | 7/6/2001 | 7/9/2001 | 7/9/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 13:26:15. Contact: ###-####...c/n issued, ok to pour ftg only 7/9/2001 2:17:46 PM
|