BLD-Final | 7/18/2001 | 7/19/2001 | 7/19/2001 | A | CANC |
Russ Owen
|
|
|
###-#### cancel per brian with steed const
|
BLD-Final | 7/19/2001 | 7/19/2001 | 7/19/2001 | P | PASS |
Russ Owen
|
|
|
fn occ --brian -###-####. ok for a certificate of completion. 7/19/2001 1:22:05 PM
|
FIRE-Final Inspection | 7/17/2001 | 7/18/2001 | 7/18/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### Final OK for certificate of completion 7/18/2001 1:26:05 PM
|
BLD-Framing/Rough-in | 7/6/2001 | 7/9/2001 | 7/9/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 17:22:22. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/6/2001 | 7/6/2001 | 7/6/2001 | P | FAIL |
Russ Owen
|
|
|
BRIAN-- ###-#### FR c/n posted. also no plans found. 7/6/2001 3:34:37 PM
|