BLD-Final | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | PASS |
Jim Storey
|
|
|
malcom ###-####
|
BLD-Framing/Rough-in | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### MALCOM
|
BLD-Framing/Rough-in | 12/6/2001 | 12/6/2001 | 12/6/2001 | P | NH |
Russ Owen
|
|
|
###-#### . came by early at 12:30 no one home came back at 1:30 still no one home called and left message. 12/6/2001 1:52:54 PM
|
BLD-Framing/Rough-in | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | PART |
Jim Storey
|
|
|
###-#### MALCOM brace pannel nailling c/n made ok. 11/14/2001 11:11:55 AM
|
BLD-Framing/Rough-in | 11/9/2001 | 11/13/2001 | 11/13/2001 | A | FAIL |
Steven Webb
|
|
|
###-#### MALCOM PLEASE CALL AT LEAST 30MIN BEFORE GOING OUT SO HE CAN MEET YOU THERE.. Not ready for inside frame, performed shear--verbal informed contractor to block shear panels and nail 6" at seams and 12" in field. 11/13/2001 8:58:33 AM
|
BLD-Aging Inspection | 10/22/2001 | 10/22/2001 | 10/22/2001 | | NH |
Jim Storey
|
|
|
called left measage for progess or will expire next step. 10/22/2001 10:56:57 AM
|
BLD-Aging Inspection | 8/20/2001 | 8/20/2001 | 8/20/2001 | | NR |
Jim Storey
|
|
|
wip n/c 8/23/2001 4:59:21 PM
|
BLD-Footing | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 11:10:47. Contact: ###-####.
|