BLD-Final | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Jim Sly
|
|
|
jp ###-#### C/C issued. 8/14/2001 3:18:11 PM
|
BLD-Energy code compliance | 7/17/2001 | 7/18/2001 | 7/18/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### c/n items complete ok to cover 7/18/2001 10:47:54 AM
|
BLD-Framing/Rough-in | 7/13/2001 | 7/13/2001 | 7/13/2001 | P | PART |
Russ Owen
|
|
|
framing and shear ###-#### You accidentally finaled this permit. need to foam and seal penetrations. 7/13/2001 3:05:17 PM
|
BLD-Foundation | 6/21/2001 | 6/21/2001 | 6/21/2001 | P | PASS |
Jim Sly
|
|
|
jerry ###-#### foundation wall
|
BLD-Footing | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 17:52:39. Contact: .
|
BLD-Footing | 1/20/2002 | 6/20/2001 | 6/20/2001 | P | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 1/20/2002 3:19:06 PM had to add this in ,first entry incorrect, footings poured no plans on site.
|