BLD-Final | 8/28/2001 | 8/28/2001 | 8/28/2001 | P | PASS |
Jim Sly
|
|
|
###-#### chuck C/C issued. 8/28/2001 12:43:17 PM
|
BLD-Energy code compliance | 7/23/2001 | 7/24/2001 | 7/24/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/20/2001 | 7/23/2001 | 7/23/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### rough frame all c/n items completed ok to insulate 7/23/2001 11:04:41 AM
|
BLD-Framing/Rough-in | 7/17/2001 | 7/17/2001 | 7/17/2001 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/17/2001 at 10:21:00. Contact: ###-####.c/n posted. 7/17/2001 3:28:03 PM
|
BLD-Framing/Rough-in | 7/11/2001 | 7/12/2001 | 7/12/2001 | A | PASS |
Dave Hannah
|
|
|
CHUCK ###-#### SHEAR PANEL ok to cover 7/12/2001 10:29:53 AM
|
BLD-Foundation | 6/22/2001 | 6/22/2001 | 6/22/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/22/2001 at 07:04:12. Contact: ###-####.
|
BLD-Footing | 6/21/2001 | 6/21/2001 | 6/21/2001 | P | PASS |
Dave Hannah
|
|
|
Jerry ###-####
|