Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-01575
StatusFinaled
Name MICRON TECHNOLOGY PCS4010
Site Address 8000 S FEDERAL WAY
Project NameMICRON BLD. 01X 1ST.FL
Customer Number4010
ePlanReviewNo
Description
MICRON BUILDING 01X - FIX BOX WASHER RELOCATION (PCS #01X-20014010) * TO REMOVE A SOLVENT HOOD AND THREE BOXWASHERS AND RELATED EQUIPMENT FROM QUARTZ ROOM 103A. TO DEMOLISH AND REMOVE TWO SECTIONS OF INTERIOR PARTITIONS AND AN INTERIOR DOOR, AS WELL AS, AN HF HOOD AND RELATED EQUIPMENT FROM WJ MAINTENANCE AREA 104E. TO EXCAVATE AND CONSTRUCT APPROXIMATELY 56 LINEAL FEET OF CONCRETE REINFORCED PIPE TRENCH WITH TILE ACCESS FLOOR AT SERVICE ROOM 102C AND WJ MAINTENANCE AREA 104E. TO INSTALL A NEW INTERIOR DOOR AND RELOCATE BOXWASHERS AND SOLVENT HOOD TO CREATE A NEW VESTIBULE 102C AND BOXWASHER ROOM 102D. THIS PERMIT IS ALSO TO REPOSITION THE EXISTING CHEMICAL PASS-THRU. THIS WORK IS BEING DONE BETWEEN GRID LINES K&L AND 0.2&0.3.5. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. PC#484-01
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/8/200110/8/200110/8/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/08/2001 at 10:21:34. Contact: ###-####. final ok special insp. doc in archive. card on site. 10/9/2001 9:46:47 AM
BLD-Final10/3/200110/3/200110/3/2001ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/03/2001 at 06:05:24. Contact: ###-####. out of time. 10/8/2001 4:21:43 PM
FIRE-Final Inspection9/25/20019/26/20019/26/2001APASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 9/25/2001 3:24:45 PM ###-#### Wayne Berry
FIRE-Final Inspection9/25/20019/25/20019/25/2001PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 09/25/2001 at 07:40:34. Contact: ###-####.
BLD-Final9/21/20019/21/20019/21/2001PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/21/2001 at 07:43:04. Contact: ###-####.
FIRE-Final Inspection9/20/20019/21/20019/21/2001ACANC
DetailsJoe Tawney
Cancel to be rescheduled 9/21/2001 11:33:34 AM
FIRE-Sprinkler Rough-in8/10/20018/13/20018/13/2001APART
DetailsRick Jackson
exit lighting Joe ###-#### reviewed exit lighting and sprinkler r/i; okay 8/13/2001 9:16:38 AM
BLD-Wall cover8/9/20018/9/20018/9/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/09/2001 at 08:03:59. Contact: ###-####.walls ok fire stoppinf at exsiting occ maintaned. 8/9/2001 11:37:35 AM
BLD-Foundation7/10/20017/12/20017/12/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/10/2001 at 06:58:57. Contact: ###-####. placed with spical insp, pending report. 7/12/2001 3:21:46 PM
BLD-Footing7/10/20017/10/20017/10/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/10/2001 at 06:57:50. Contact: ###-####. placed with special insp. 7/10/2001 4:45:16 PM