Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01585
StatusExpired
Name AMERICAN DREAM BUILDING CO
Site Address 2211 -2213 N BRYSON RD
Project NameDUPLEX
Customer Number 
ePlanReviewNo
Description
To construct a 2725 sq. ft. DUPLEX. UNIT 1: two bedroom, two and half bathroom 1748 sq. ft. two story (1360 sq. ft. first floor/388 sq. ft. second floor) with a attached 528 sq. ft. two car garage, 271 sq. ft. covered back porch and a 72 sq. ft. covered front porch. UNIT 2: two bedroom, one and three quarter bathroom 977 sq. ft. single story with a attached 468 sq. ft. two car garage and a 80 sq. ft. covered front porch. Per approved plans, engineering and requirement list. NOTE: This unit is being constructed as a duplex and CANNOT be converted or sold as individual units or townhouses. PC#435 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/24/20023/25/20023/25/2002PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/24/2002 at 22:06:05. Contact: ###-####. c.c # 23075 issued 3/25/2002 2:15:52 PM
FIRE-Final Inspection3/15/20023/18/20023/18/2002AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/15/2002 at 17:24:49. Contact: ###-####. 3/18/2002 12:57:43 PM needs drive ways from pads to street . Holes in garage walls sealed 3/18/2002 2:36:21 PM
BLD-Aging Inspection12/31/200112/31/200112/31/2001 DONE
DetailsDave Hannah
WIP 1/2/2002 8:52:23 AM
BLD-Energy code compliance10/29/200110/30/200110/30/2001APASS
DetailsDave Hannah
###-#### GARY c/n items complete ok to cover 10/30/2001 9:08:04 AM
BLD-Framing/Rough-in10/24/200110/26/200110/26/2001APART
DetailsDave Hannah
fr insp- gary ###-#### c/n on site ok to insulate 10/26/2001 8:56:25 AM
BLD-Conference10/16/200110/17/200110/17/2001ADONE
DetailsDave Hannah
###-####
BLD-Framing/Rough-in10/15/200110/15/200110/15/2001PFAIL
DetailsDave Hannah
###-#### gary c/n on site 10/15/2001 4:15:37 PM
BLD-Framing/Rough-in10/1/200110/2/200110/2/2001ANR
DetailsDave Hannah
###-#### needs elec rough in sign off and mec c/n items completed and signed off also needs truss eng and appr plans on site talked to bldr he will get these items done and resch 10/2/2001 9:00:33 AM
BLD-Framing/Rough-in8/22/20018/23/20018/23/2001APASS
DetailsDave Hannah
shear-- ###-#### -gary ok to cover e 8/23/2001 9:49:33 AM xt wa 8/23/2001 9:49:40 AMlls 8/23/2001 9:49:45 AM
BLD-Framing/Rough-in8/22/20018/22/20018/22/2001PFAIL
DetailsDave Hannah
###-#### gary shear nailing ok to cover east side only 8/22/2001 3:58:19 PM
BLD-Other7/30/20017/31/20017/31/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/30/2001 at 12:02:50. Contact: ###-####. fire wall pass 7/31/2001 10:30:41 AM
BLD-Foundation7/6/20017/6/20017/6/2001PPART
DetailsTony Young
###-####
wip///verbal warnings about setbacks///they will verify b-4 pouring 7/6/2001 2:13:32 PM
BLD-Footing7/5/20017/5/20017/5/2001PPART
DetailsDave Hannah
###-#### work in progress no prop lines set cant check set backs crew said they will have them at foundation pour every things good from other houses and fences 7/5/2001 3:27:49 PM