Permit Information
Permit NumberBLD01-01592
StatusFinaled
Name WESTERN POWER SPORTS (RACKING)
Site Address 601 W GOWEN RD
Project NameWESTERN POWER-RACKING
Customer Number 
ePlanReviewNo
Description
(Western Power Sports) Install a three tiered steel storage racking system with catwalks, guardrails, and exit stairs at corners in a 106,964 sq. ft. warehouse building per approved plans on file. Work to include steel storage rack installation per UBC Chapter 22, Division X and fire sprinkler work. Exit stairs to meet UBC provisions of a "Private Stairway". Stairs serve an occupant load of less than 10. This is a Scope of Work Permit. Letter of Completion to be issued when done. NOTE: This building is fully fire sprinklered and has 60' minimum setbacks on all sides for unlimited area. (PC#487-01) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/2/200110/3/200110/3/2001APASS
DetailsJim Storey
greg ###-#### final ok per approved plan. 10/3/2001 9:28:51 AM
FIRE-Final Inspection8/28/20018/28/20018/28/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 8/28/2001 7:11:06 AM
BLD-Final8/27/20018/27/20018/27/2001PPART
DetailsJim Storey
Added by Inspector: 301 On 8/27/2001 4:29:57 PM ok for use/ corner berriors req./ s.e gaurd railling up 1 inch to 42 min.
BLD-Conference8/17/20018/17/20018/17/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/17/2001 at 06:34:31. Contact: ###-####. notes to 8/15 responce blong on this action. 8/17/2001 10:06:59 AM
FIRE-Conference8/16/20018/17/20018/17/2001APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/16/2001 at 20:21:52. Contact: ###-####. requirements for obtaining occupancy with Jim Storey 8/17/2001 12:24:48 PM
BLD-Conference8/15/20018/15/20018/15/2001PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/15/2001 at 11:05:54. Contact: ###-####. fire dept. mandated that draft curtins be removed. approved plan are specific to location of draft curtins architect to resolve isue with plan reviewers no occupance until resolved/ no storage on racking allowed until approval from bld. dept. 8/17/2001 9:58:21 AM
FIRE-Conference8/15/20018/15/20018/15/2001PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/15/2001 at 11:05:04. Contact: ###-####. ddiscuseed moving requirements with Pat; told him to talk to Jim Storey about his requirements 8/15/2001 2:28:37 PM