BLD-Final | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### BRETT c.c # 21695 ISSUED 10/11/2001 4:22:37 PM
|
BLD-Energy code compliance | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | PASS |
Alan Hauser
|
|
|
###-####- JOHN ENERGY
|
BLD-Framing/Rough-in | 8/23/2001 | 8/24/2001 | 8/24/2001 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 407 On 8/23/2001 5:18:19 PM cn posted 8/23/2001 9:05:20 PM
|
BLD-Framing/Rough-in | 8/23/2001 | 8/23/2001 | 8/23/2001 | P | CANC |
Russ Owen
|
|
|
john- ###-#### fr , called contractor unable to do this day i have reschedualed for am. 8/23/2001 5:16:56 PM
|
BLD-Final | 8/21/2001 | 8/22/2001 | 8/22/2001 | A | NR |
Dave Hannah
|
|
|
###-#### bret note this was a rough frame but still needed mec and seal package 8/22/2001 11:16:49 AM
|
BLD-Framing/Rough-in | 8/7/2001 | 8/8/2001 | 8/8/2001 | A | PART |
Jim Sly
|
|
|
###-#### or ###-#### Shear OK. 8/8/2001 10:50:04 AM
|
BLD-Footing | 7/6/2001 | 7/6/2001 | 7/6/2001 | P | PART |
Tony Young
|
|
|
###-####
already pouring, looks ok 7/9/2001 8:43:56 AM
|