BLD-Final | 1/8/2002 | 1/9/2002 | 1/9/2002 | A | PASS |
Steven Webb
|
|
|
###-#### lockbox 193 c. of c. #20973 issued 1/9/2002 8:36:58 AM
|
BLD-Final | 1/7/2002 | 1/7/2002 | 1/7/2002 | P | FAIL |
Steven Webb
|
|
|
###-#### LOCK BOX 193 c/n --tempered glass above master tub and address required on house. 1/7/2002 1:07:09 PM
|
BLD-Aging Inspection | 12/5/2001 | 12/5/2001 | 12/5/2001 | | PART |
Steven Webb
|
|
|
wip 12/5/2001 12:18:40 PM
|
BLD-Energy code compliance | 10/3/2001 | 10/3/2001 | 10/3/2001 | P | PART |
Steven Webb
|
|
|
###-#### ok to cover--prior c/n items completed--need energy report prior to issuance of c. of c. at final. 10/3/2001 2:19:31 PM
|
BLD-Framing/Rough-in | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | PART |
Steven Webb
|
|
|
###-#### TERRY ok t 9/28/2001 1:31:03 PM ok to insulate---c/n 9/28/2001 1:31:51 PM
|
BLD-Framing/Rough-in | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | CANC |
Steven Webb
|
|
|
shear nail reinspection terry ###-####-- cancel per terry
|
BLD-Framing/Rough-in | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PART |
Steven Webb
|
|
|
terry--###-#### shear nail Shear--ok to side--retrofit hd at front needs inspection at framing 9/7/2001 1:14:59 PM
|
BLD-Framing/Rough-in | 9/4/2001 | 9/5/2001 | 9/5/2001 | P | FAIL |
Steven Webb
|
|
|
TERRY ###-#### SHEAR WALL C/n posted 9/5/2001 3:22:18 PM
|
BLD-Foundation | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 09:24:45. Contact: ###-####. wip 7/9/2001 2:07:00 PM
|
BLD-Footing | 7/6/2001 | 7/6/2001 | 7/6/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 09:36:17. Contact: ###-####. wip 7/6/2001 2:59:07 PM
|