Permit Information
Permit NumberBLD01-01630
StatusExpired
Name ST LUKES STL210504
Site Address 190 E BANNOCK ST
Project NameST LUKES-WEST WING
Customer Number210504
ePlanReviewNo
Description
(ST LUKES-WEST WING)(FIRST FLOOR REMODEL-PHASE B) **NOTE: Remodel cannot begin until the seismic upgrade (BLD00-02394) to this floor has been completed & approved by special inspection report and the structural inspector.** To remodel the remaining 5,310 sq.ft. area on the south end of the 1st floor, West Wing, for SLRMC Administrative Offices. Interior demolition performed under BLD01-01678. New work includes remodel of the existing interior stair enclosure and enclosure extension to the new exterior entry; interior non-bearing, non-combustible, fire-resistivve walls to create 13 office / work areas; a conference room, houskeeping room, and open non-rated corridor / reception / waiting area; two new accessible restrooms; upgrade electrical, mechanical, plumbing, fire sprinkler & alarm systems and interior finishes as required for tenant needs and code compliance. All per approved plans on file. This project will complete the remodel of the first floor. A "Letter of Compliance / Completion" is required for this permit. NOTE: A "Certificate of Occupancy" for the 1st Floor West Wing Administrative offices is to be issued when BLD01-00539 (North end) & BLD01-01630 (South end) are completed and approved. PC#01-496/drs NOTE: This building is fully sprinklered.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference5/18/20045/18/20045/18/2004PPASS
DetailsDave Hannah
BLD-Aging Inspection5/12/20045/12/20045/12/2004 PASS
DetailsDave Hannah
BLD-Conference5/12/20045/12/20045/12/2004PFAIL
DetailsDave Hannah
BLD-Aging Inspection3/10/20043/10/20043/10/2004 PASS
DetailsDave Hannah
BLD-Aging Inspection1/9/20041/9/20041/9/2004 PASS
DetailsDave Hannah
BLD-Aging Inspection11/3/200311/3/200311/3/2003 DONE
DetailsDave Hannah
work in progress 11/3/2003 7:54:53 AM
BLD-Aging Inspection8/25/20038/25/20038/25/2003 PASS
DetailsDave Hannah
wip 8/25/2003 9:11:46 AM
BLD-Conference6/23/20036/23/20036/23/2003PPASS
DetailsCarl Dependahl
Kelly...demo wip; need spec insp for seismic 6/23/2003 3:55:48 PM 6/23/2003 3:56:08 PM
BLD-Conference5/8/20035/8/20035/8/2003APASS
DetailsCarl Dependahl
w/ Rick J re corridors 5/8/2003 9:19:03 AM
BLD-Aging Inspection4/30/20034/30/20035/6/2003 PASS
DetailsCarl Dependahl
west wing project,seismic at north portion is now approved...work can proceed. 5/6/2003 9:46:39 AM
BLD-Conference2/12/20022/12/20022/12/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/12/2002 6:29:39 PM work postponed til north end completed
BLD-Aging Inspection1/2/20021/2/20021/8/2002 NR
DetailsCarl Dependahl
1st fl west wing remodel, haven't rec'd eng's report for underlying struct upgrade req'd by permit...wip? 1/8/2002 5:54:50 PM