BLD-Final | 8/23/2001 | 8/24/2001 | 8/24/2001 | A | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 8/24/2001 1:28:02 PM
|
BLD-Framing/Rough-in | 7/23/2001 | 7/23/2001 | 7/23/2001 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 7/23/2001 11:10:37 AM all c/n items completed shear walls ok insulation ok ok to cover
|
BLD-Energy code compliance | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### told chuck every thing was ok all but for the two retro fit hold downs they need to get installed i told him they could start sheet rock but to leave that area open and to call whin they get thim in shear panels ok to cover ext 7/20/2001 2:59:07 PM
|
BLD-Framing/Rough-in | 7/19/2001 | 7/19/2001 | 7/19/2001 | P | FAIL |
Russ Owen
|
|
|
fr & shear nail -jp ###-#### c/n posted. 7/19/2001 3:19:20 PM
|
BLD-Framing/Rough-in | 7/17/2001 | 7/17/2001 | 7/17/2001 | P | FAIL |
Russ Owen
|
|
|
###-#### Chuckc/n posted. 7/17/2001 3:38:49 PM
|
BLD-Foundation | 6/27/2001 | 6/28/2001 | 6/28/2001 | A | PART |
Dave Hannah
|
|
|
ryan ###-#### work in progress 6/28/2001 12:22:03 PM
|
BLD-Footing | 6/27/2001 | 6/27/2001 | 6/27/2001 | P | PART |
Jim Sly
|
|
|
Ryan ###-####
|