BLD-Final | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/01/2002 at 14:20:17. Contact: ###-####. OK for Perm Occ. 4/2/2002 11:10:04 AM
|
Permanent Occupancy | | 4/2/2002 | 4/2/2002 | | DONE |
|
|
|
|
BLD-Final | 3/29/2002 | 4/1/2002 | 4/1/2002 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/29/2002 at 13:17:12. Contact: ###-####.
|
BLD-Final | 12/14/2001 | 12/17/2001 | 12/17/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 15:23:04. Contact: ###-####. OK for Temp Occ......C/N Obtain Perm Occ status within 90 days of this notice. 12/17/2001 11:20:09 AM
|
FIRE-Final Inspection | 12/14/2001 | 12/17/2001 | 12/17/2001 | A | CANC |
Troy Cobbley
|
|
|
duplicate inspection 12/17/2001 10:39:29 AM
|
BLD-Final | 12/12/2001 | 12/13/2001 | 12/13/2001 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/12/2001 at 14:36:59. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/16/2001 | 10/17/2001 | 10/17/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### cyle NR 10/17/2001 4:32:30 PM
|
BLD-Framing/Rough-in | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/01/2001 at 08:34:00. Contact: ###-####. Superint called in wrong permit # 10/1/2001 2:35:31 PM
|
BLD-Footing | 8/22/2001 | 8/23/2001 | 8/23/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 14:52:11. Contact: ###-####. Rebar not finished.....Special insp to check and note on report, or recall for insp of rebar when completed (design 2500 PSI) 8/23/2001 9:34:20 AM
|