BLD-Final | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 10/2/2001 3:53:53 PM ok perm oc. 10/2/2001 3:55:11 PM
|
FIRE-Final Inspection | 9/21/2001 | 9/24/2001 | 9/24/2001 | A | PASS |
Rick Jackson
|
|
|
open at 10am ###-#### Dennis Bell
|
BLD-Final | 9/13/2001 | 9/14/2001 | 9/14/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### DENNIS . door hardware they have installed dead bolt. 9/14/2001 11:49:14 AM
|
BLD-Final | 8/15/2001 | 8/15/2001 | 8/15/2001 | A | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 8/15/2001 8:11:54 AM Reinsp OK for certificate of completion/ or CO
|
BLD-Final | 8/10/2001 | 8/13/2001 | 8/13/2001 | P | PART |
Russ Owen
|
|
|
ROBERT ###-#### FN OCC . ok temo oc, need door hardware openable from inside w-out knob turn. has been removed at this tim.8/13/2001 2:54:41 PM 8/13/2001 2:55:03 PM
|
FIRE-Final Inspection | 8/10/2001 | 8/13/2001 | 8/13/2001 | A | FAIL |
Joe Tawney
|
|
|
Final Fail Door hdwre 8/13/2001 11:14:10 AM
|
BLD-Final | 8/9/2001 | 8/10/2001 | 8/10/2001 | P | NR |
Russ Owen
|
|
|
robert fn 425/531/1053 --structual & fn please. needs fire/life safety,and mec. called contractor. 8/10/2001 3:51:45 PM
|
FIRE-Final Inspection | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PART |
Joe Tawney
|
|
|
OK on spklr head installation 8/10/2001 11:03:18 AM
|
BLD-Framing/Rough-in | 8/8/2001 | 8/9/2001 | 8/9/2001 | A | PART |
Russ Owen
|
|
|
R/I - ROBERT -UMENTUM -- ###-#### -CALL 1ST BEFORE INSP. New door frame ok, need to have the new exterior elevated concrete landing approved by office. do not pour. 8/9/2001 10:42:18 AM
|