BLD-Conference | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | DONE |
Steven Webb
|
|
|
Extension only per George Slane--Informed home owner of extension--He was thankful for the extension--will call for inspections prior to the 180 days. 2/7/2003 4:15:59 PM
|
BLD-Conference | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | PASS |
Jim Storey
|
|
|
###-#### Husband had surgery will finish when recovered wip will finsh sidding. 6/10/2002 5:34:35 PM
|
BLD-Final | 10/31/2001 | 11/1/2001 | 11/1/2001 | P | CANC |
Dave Hannah
|
|
|
###-####
|
BLD-Energy code compliance | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 07:22:35. Contact: ###-####. ok to cover 10/2/2001 12:48:43 PM
|
BLD-Framing/Rough-in | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 08:10:40. Contact: ###-####. ok to insulate--plumbing r.i needed prior to ok to cover. 9/27/2001 1:30:36 PM
|
BLD-Other | 9/13/2001 | 9/14/2001 | 9/14/2001 | A | DONE |
Dave Hannah
|
|
|
can you place a stop work returned check 2 times. thanks linda . Stop work notice issued home owner will get payment down town 9/14/2001 9:52:44 AM
|
BLD-Framing/Rough-in | 8/8/2001 | 8/9/2001 | 8/9/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 18:06:53. Contact: ###-####. sheer ok 420. 8/9/2001 3:01:56 PM
|
BLD-Other | 8/9/2001 | 8/9/2001 | 8/9/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 8/9/2001 10:23:03 AM shear--ok to side 8/9/2001 11:11:58 AM
|
BLD-Framing/Rough-in | 8/8/2001 | 8/8/2001 | 8/8/2001 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 08:42:35. Contact: ###-####. c/n posted-no access 8/9/2001 7:56:34 AM
|
BLD-Foundation | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | PASS |
Dave Hannah
|
|
|
fd-- jim-- ###-####
|
BLD-Footing | 6/28/2001 | 6/28/2001 | 6/28/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|