BLD-Final | 12/31/2001 | 12/31/2001 | 12/31/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/31/2001 at 08:20:49. Contact: ###-####.struct ok. 12/31/2001 6:02:33 PM
|
BLD-Final | 12/23/2001 | 12/24/2001 | 12/24/2001 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/23/2001 at 17:16:32. Contact: .Has failed plumbing this morning,no contact number given, needs to be recalled when plumbing has been finaled. 12/24/2001 11:24:18 AM
|
BLD-Aging Inspection | 11/28/2001 | 11/28/2001 | 11/29/2001 | | NR |
Carl Dependahl
|
|
|
wip 11/29/2001 2:58:23 PM
|
BLD-Conference | 9/25/2001 | 9/25/2001 | 9/25/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/25/2001 8:45:14 AM beam at stairs ok
|
BLD-Energy code compliance | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PASS |
Carl Dependahl
|
|
|
###-#### RICK
|
BLD-Framing/Rough-in | 9/25/2001 | 9/25/2001 | 9/25/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/25/2001 9:21:13 AM beam & fireblocks ok, ok to cover
|
BLD-Framing/Rough-in | 9/20/2001 | 9/21/2001 | 9/21/2001 | A | FAIL |
Carl Dependahl
|
|
|
r/i rick ###-#### ...verify beam, complete fireblox/air seal, ok to insul. 9/21/2001 5:48:53 PM
|
BLD-Other | 9/21/2001 | 9/21/2001 | 9/21/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/21/2001 9:10:52 AM need to verify beam loading...post added by stairs shortens span...NO beam size on plans
|
BLD-Framing/Rough-in | 9/10/2001 | 9/10/2001 | 9/10/2001 | A | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/10/2001 10:21:04 AM add 3rd #1 2x12 & reduce span to 10' max. or need calcs to justify beam carrying 2nd floor at stairs...ext shear ok
|
BLD-Other | 9/9/2001 | 9/10/2001 | 9/10/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/09/2001 at 17:24:38. Contact: ###-####. ext shear ok to side at n/s...add blocks at front porch area panels. ok to continue. 9/10/2001 10:17:56 AM
|
BLD-Conference | 9/6/2001 | 9/7/2001 | 9/7/2001 | P | PASS |
Carl Dependahl
|
|
|
CONFERENCE ###-#### RICK ok to recover ext panels pend elec ok; chk w/ 415. 9/7/2001 3:30:58 PM
|
BLD-Framing/Rough-in | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PART |
Tony Young
|
|
|
look at part of shear 8/30/2001 12:49:30 PM
upper front and rear pop outs, and new addition shear ok 8/30/2001 3:37:43 PM
|
BLD-Foundation | 8/1/2001 | 8/2/2001 | 8/2/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 18:21:32. Contact: ###-####.
|
BLD-Footing | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | PASS |
Tom Arcoraci
|
|
|
Rick ###-####
|
BLD-Conference | 7/2/2001 | 7/3/2001 | 7/3/2001 | A | PASS |
Tony Young
|
|
|
for a conf--###-####- rick
conf. on framing, ftgs, etc 7/3/2001 10:23:55 AM
|